Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Avista 250423 Lewiston Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 250423 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 2325 Park Ave City/District: Lewiston Contractor/Job#: W/O 1036379325 Foreman: Operator Supervisor: Bryon On-Site: N Um henour Job Description: 3/" service line install System Type: ® GD One-Call Ticket: 2025162922 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT Trench provided by owner 3. Bedding/Backfill 3.15 SAT Only observed operator shading __pipe as owner is backfilling 4. Pipe Installation(Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 PSI-10 Minutes 9. OQ Qualifications 4.31 SAT 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 SAT Pressure gauge date in file 15. EFV Installation 3.16 N/A Already installed at main 16. MAOP 4.15 N/A 17. Purge 3.17 SAT 18. Safety Equipment GESH 4 SAT Extinguisher 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT Gas stub and electrical conduit 21. Plastic Pine 3.23-25 SAT Used Lyco fittings - Joiner(s) Qualified - Fusion Tools - Heat Plate - IPUC Form 4 Rev. 12/11/2024 IPUC Construction Inspection -Joining Procedure 22. Steel Pipe N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 - Non-Destructive Testing 3.12 -Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: Address: 2325 Park Ave, Lewiston, Idaho Observations Included: Customer provided trench, shading, Lyco fittings, safety equipment, tracer wire, pressure test, purging verification of OQ records and questioned personnel on squeeze/release times. I traveled back to Boise and completed all pertinent paperwork. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Date: 250423 Signature: % Signature: IPUC Form 4 Rev.12/11/2024