Intermountain Gas 250407 Twin Falls Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 7 Apr 2025 Company/Owner: Intermountain Gas Company (IGC)/ Unit/OPID: 8160 KV Utilities Address: 312 Walnut St City/District: Twin Falls Contractor/Job#: W012086040 Foreman: Operator Supervisor: T. Anderson Job Description: %" Service install System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025142578 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 SAT 1200 EFV 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Fusing& Stab fittings - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 _ - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 SAT Welded on 3/" tapping tee - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 321 Walnut St, Twin Fals, Idaho Installed 88 ft of 3/" MDPE service from the steel main in the alley to the meter location. Observations Included: Line locating, boring, trenching, stab fittings, fusing, EFV installation, safety equipment, tracer wire, U/T for wall thickness, welding of 3/"tapping tee, verification of OQ records and questioned bore operator on rest times after doing pullback of service line. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250407 Signature: / Signature: 0 f�'q IPUC Form 4 Rm 12/10/2024