Loading...
HomeMy WebLinkAboutIntermountain Gas 250403 Middleton Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 250403 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 513 Joy Ave, Caldwell l City/District: Caldwell Contractor/Job#: W012091541 Foreman: Operator Supervisor: None On-Site S. Strawn Job Description: %" Service install System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025132542 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Identified lack of bore depth, did OPS 322 not install service in Middleton. 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 PSI-15 Minutes 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 1200 EFV 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Re,,. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 550 Hidden Mill Ct, Middelton Observations Included: The existing bore beneath the driveway was deemed too shallow and the service line was not installed. Address: 513 Joy Ave, Caldwell Observations Included: Correct trench depth, backfilling, stab fittings,pressure testing,purging, EFV installation, safety equipment, tracer wire, line locating, verification of OQ records and discussed pressure test requirements. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Brooks Date: Reviewer: Date: 250403 Signature: Signature: IPUC Form 4 Rev. 12/10/2024