Loading...
HomeMy WebLinkAboutIntermountain Gas 250311 Caldwell Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 11 March 2025 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 1209 N 3rd Ave Trl#1, 3 and 17 City/District: Caldwell Contractor/Job#: W012050208, Foreman: Operator Supervisor: None W012050202, W012061928 B. Schwehr Job Description: '/" Riser Abandonment System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: IGC did the locating on site Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native Soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 N/A 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 SAT %" Service Risers Abandoned 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 N/A =_ - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 SAT Cut %" service lines off main and - Welder(s) Qualified OPS 201 welded caps on tapping tee. Also Pipe/Coating—Inspected/Repaired OPS 202 Foam filled the abandoned lines - Cathodic Protection OPS 306 on both ends. Rewrapped tapping - Non-Destructive Testing OPS 401 tees. - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 1209 N Yd Ave Trl #1, 3 and 17, Caldwell, Idaho Observations: • Ensured availability of safety equipment to maintain compliance with workplace safety standards. • Verified Operator Qualification(OQ) records to confirm personnel competency and adherence to • regulatory requirements. • Witnessed welding activities to ensure precision and compliance with technical and safety • specifications. • Monitored trenching operations to verify proper depth, alignment, and adherence to safety protocols. • Watched backfilling procedures to ensure appropriate bedding and backfilling. • IGC personnel conducted line locating to identify and mark underground utilities, preventing • potential damages. • The operator inspected and wrapped exposed steel to provide corrosion protection and extend • material durability. • Personnel cut off the risers and filled decommissioned lines with foam to ensure proper sealing and • safety. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250311 Signature: Signature: IPUC Form 4 Rev.12/10/2024