Loading...
HomeMy WebLinkAbout20180316Staff 1-14 to Atlanta Power.pdfBRANDON KARPEN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-03s7 IDAHO BAR NO. 7956 RECEIVED ?0lS tlfiR I 5 Alt ll: I 7 ,,,,1,!: il i'*1?*hl8t'o* Street Address for Express Mail: 472W, WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE INVESTIGATION OF ATLANTA POWER COMPANY SERVICE AND CUSTOMER RELATIONS CASE NO. ATL.E.18.O1 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO ATLANTA POWER COMPANY The Staff of the Idaho Public Utilities Commission requests that Rocky Mountain Power provide the following documents and information as soon as possible, but no later than FRIDAY, APRrL 6,2018. This Production Request is to be considered continuing, and Atlanta Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparing the documents. Please identiff the name, job title, location and telephone number of the record holder. In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. FIRST PRODUCTION REQUEST TO ATLANTA POWER ) ) ) ) ) ) ) ) ) I MARCH 16,2018 REQUEST NO. 1: Please provide a list with the names and job functions of all Atlanta Power employees or contractors. REQUEST NO. 2: Please provide a breakdown of customers taking service under each distinct rate schedule including the total number of current customers. REQUEST NO.3: Please provide the names and addresses for all customers currently connected to the Atlanta Power system. Please include the names and addresses of seasonal customers that have had service at any time since January 1,2017. REQUEST NO. 4: Please provide the following information regarding outages that occurred in2017: a. the total number of outages; b. the duration ofeach outage; c. the total number of outages that lasted more than 24 hours; d. the cause ofeach outage; e. where each outage occurred (dam, turbine, generator, distribution, etc.); and f. how each outage was fixed and which Atlanta Power employees or contractors helped resolve each outage. REQUEST NO. 5: Please detail any and all repairs made to the hydroelectric turbine since January 1,2016. Please provide a description ofeach repairjob and the associated cost. REQUEST NO. 6: Please provide the following information regarding operation of the diesel generator in 2017 : a. the total hours the generator was operated rn20l7; b. the total gallons of fuel consumed; and c. all repairs made to the generator and control s in 2017 and cost of each repair. REQUEST NO. 7: Please provide a list of all diesel fuel purchases since January 1, 2016. Please include receipts for each purchase. REQUEST NO. 8: What is the total capacity of the Company's diesel fuel tank? When the Company fills the tank, is it filled to capacity? If not, why? FIRST PRODUCTION REQUEST TO ATLANTA POWER 2 MARCH 16,2018 REQUEST NO. 9: Please explain all restrictions for diesel fuel deliveries. REQUEST NO. 10: What upgrades or improvements has the Company made to the distribution system in20l6 and20l7? What was the associated cost? REQUEST NO. 11: Please provide an inventory of all equipment purchased by the Company since January 1,2016. REQUEST NO. 12: Please provide all generating equipment specification data by unit. This data would include, but is not limited to: a. Equipment type; b. Manufacturer; c. Model number; d. Year of manufacture; and e. Rated output REQUEST NO. 13: Please provide a system map identiffing the Company's generation and distribution facilities. REQUEST NO. 14: Please explain what the Company's intentions are moving forward. Does the Company intend to maintain and operate the system under current ownership? If not, is the Company considering selling the system or transferring ownership to another entity such as a cooperative? FIRST PRODUCTION REQUEST TO ATLANTA POWER J MARCH 16,2018 DATED at Boise,Idaho, this tlP au1of March 2018. General Technical Staff: Johnathan Farley Kevin Keyt Brad Iverson-Long Rick Keller Michael Eldred i:umisc:prodreq/atlel 8. lbkjfprod req I FIRST PRODUCTION REQUEST TO ATLANTA POWER 4 MARCH 16,2018 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS I6TH DAY OF MARCH 2018, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO ATLANTA POWER COMPANY, IN CASE NO. ATL-E-18.01, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: ISRAEL RAY ATLANTA POWER COMPANY 11I40 CHICKEN DINNER RD CALDWELL ID 83607 SECRET CERTIFICATE OF SERVICE