IN THE MATTER OF THE INVESTIGATION
OF ATLANTA POWER COMPANY SERVICE
AND CUSTOMER RELATIONS
CASE NO. ATL.E.18.O1
FIRST PRODUCTION
REQUEST OF THE
COMMISSION STAFF
TO ATLANTA POWER
COMPANY
The Staff of the Idaho Public Utilities Commission requests that Rocky Mountain Power
provide the following documents and information as soon as possible, but no later than
FRIDAY, APRrL 6,2018.
This Production Request is to be considered continuing, and Atlanta Power is requested
to provide, by way of supplementary responses, additional documents that it or any person acting
on its behalf may later obtain that will augment the documents or information produced.
Please provide answers to each question, supporting workpapers that provide detail or are
the source of information used in calculations, and the name, job title and telephone number of
the person preparing the documents. Please identiff the name, job title, location and telephone
number of the record holder.
In addition to the written copies provided as response to the requests, please provide all
Excel and electronic files on CD with formulas activated.
FIRST PRODUCTION REQUEST
TO ATLANTA POWER
)
)
)
)
)
)
)
)
)
I MARCH 16,2018
REQUEST NO. 1: Please provide a list with the names and job functions of all Atlanta
Power employees or contractors.
REQUEST NO. 2: Please provide a breakdown of customers taking service under each
distinct rate schedule including the total number of current customers.
REQUEST NO.3: Please provide the names and addresses for all customers currently
connected to the Atlanta Power system. Please include the names and addresses of seasonal
customers that have had service at any time since January 1,2017.
REQUEST NO. 4: Please provide the following information regarding outages that
occurred in2017:
a. the total number of outages;
b. the duration ofeach outage;
c. the total number of outages that lasted more than 24 hours;
d. the cause ofeach outage;
e. where each outage occurred (dam, turbine, generator, distribution, etc.); and
f. how each outage was fixed and which Atlanta Power employees or contractors helped
resolve each outage.
REQUEST NO. 5: Please detail any and all repairs made to the hydroelectric turbine
since January 1,2016. Please provide a description ofeach repairjob and the associated cost.
REQUEST NO. 6: Please provide the following information regarding operation of the
diesel generator in 2017 :
a. the total hours the generator was operated rn20l7;
b. the total gallons of fuel consumed; and
c. all repairs made to the generator and control s in 2017 and cost of each repair.
REQUEST NO. 7: Please provide a list of all diesel fuel purchases since January 1,
2016. Please include receipts for each purchase.
REQUEST NO. 8: What is the total capacity of the Company's diesel fuel tank? When
the Company fills the tank, is it filled to capacity? If not, why?
FIRST PRODUCTION REQUEST
TO ATLANTA POWER 2 MARCH 16,2018
REQUEST NO. 9: Please explain all restrictions for diesel fuel deliveries.
REQUEST NO. 10: What upgrades or improvements has the Company made to the
distribution system in20l6 and20l7? What was the associated cost?
REQUEST NO. 11: Please provide an inventory of all equipment purchased by the
Company since January 1,2016.
REQUEST NO. 12: Please provide all generating equipment specification data by unit.
This data would include, but is not limited to:
a. Equipment type;
b. Manufacturer;
c. Model number;
d. Year of manufacture; and
e. Rated output
REQUEST NO. 13: Please provide a system map identiffing the Company's generation
and distribution facilities.
REQUEST NO. 14: Please explain what the Company's intentions are moving forward.
Does the Company intend to maintain and operate the system under current ownership? If not, is
the Company considering selling the system or transferring ownership to another entity such as a
cooperative?
FIRST PRODUCTION REQUEST
TO ATLANTA POWER J MARCH 16,2018
DATED at Boise,Idaho, this tlP au1of March 2018.
General
Technical Staff: Johnathan Farley
Kevin Keyt
Brad Iverson-Long
Rick Keller
Michael Eldred
i:umisc:prodreq/atlel 8. lbkjfprod req I
FIRST PRODUCTION REQUEST
TO ATLANTA POWER 4 MARCH 16,2018
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS I6TH DAY OF MARCH 2018,
SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE
COMMISSION STAFF TO ATLANTA POWER COMPANY, IN CASE NO.
ATL-E-18.01, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE
FOLLOWING:
ISRAEL RAY
ATLANTA POWER COMPANY
11I40 CHICKEN DINNER RD
CALDWELL ID 83607