Loading...
HomeMy WebLinkAboutIntermountain Gas 250331 Kuna Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 31 March 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Services-684/702/685/663/ Striped Owl St City/District: Kuna Bores-660/612 Striped Owl St Contractor/Job #: WO12083844, Foreman: Operator Supervisor: None W012083981, W012087609, Greysen May, W012083993 Corey Anderson Job Description: '/ Service Install and Driveway bores System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025120421, 2025120418, 2025130761, Total Inspection Days: 1.0 2025120441 Services, Bores 2025120425, 2025120439 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Trenching and Driveway bores OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native Soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 98 PSI-15 Minutes 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 7. Purge OPS 603 SAT P T IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT 21. Plastic Pine OPS 307 SAT Fusing and Stabbing - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 684/702/685/663/ Striped Owl St-Services, Bores-660/612 Striped Owl St, Kuna, Idaho Observations Included: -Inspected and confirmed the use of appropriate safety equipment during all activities. -Verified Operator Qualification(OQ) records to ensure compliance -Monitored the processes of pipe stabbing, fusing, pressure testing, and purging for adherence to standards. -Oversaw line locating and tracer wire installations for accuracy and proper execution. -Assessed trenching, boring, bedding, and backfilling operations for compliance with safety and procedural guidelines. -Conducted employee knowledge checks on squeeze and release times to ensure proper understanding and implementation. i Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Pe ns Date: Reviewer: Brooks Date: 250331 Signature: Signature: IPUC Form 4 Rev. 12/10/2024