Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250331 Kuna Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 31 March 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Services-684/702/685/663/ Striped Owl St City/District: Kuna Bores-660/612 Striped Owl St Contractor/Job #: WO12083844, Foreman: Operator Supervisor: None W012083981, W012087609, Greysen May, W012083993 Corey Anderson Job Description: '/ Service Install and Driveway bores System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025120421, 2025120418, 2025130761, Total Inspection Days: 1.0 2025120441 Services, Bores 2025120425, 2025120439 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Trenching and Driveway bores OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native Soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 98 PSI-15 Minutes 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 7. Purge OPS 603 SAT P T IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT 21. Plastic Pine OPS 307 SAT Fusing and Stabbing - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 684/702/685/663/ Striped Owl St-Services, Bores-660/612 Striped Owl St, Kuna, Idaho Observations Included: -Inspected and confirmed the use of appropriate safety equipment during all activities. -Verified Operator Qualification(OQ) records to ensure compliance -Monitored the processes of pipe stabbing, fusing, pressure testing, and purging for adherence to standards. -Oversaw line locating and tracer wire installations for accuracy and proper execution. -Assessed trenching, boring, bedding, and backfilling operations for compliance with safety and procedural guidelines. -Conducted employee knowledge checks on squeeze and release times to ensure proper understanding and implementation. i Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Pe ns Date: Reviewer: Brooks Date: 250331 Signature: Signature: IPUC Form 4 Rev. 12/10/2024