Loading...
HomeMy WebLinkAboutIntermountain Gas 250326 Blackfoot Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 250326 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 2354, 2355, 2374 Caliber Place City/District: Blackfoot Contractor/Job#: W012076366 Foreman: Operator Supervisor: Austin Stewart W012076359,W012076832 Scott Millard Job Description: '/" Service Line(s) System Type: Z GD ❑ GT ❑ GG One-Call Ticket: 2025122893, 2025122892, 2025122902 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT V PE dated 12/2022 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge used for open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 95/96 PSI for 15 min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet meter separation 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 2600 pre-installed with main 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher& JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate stub on second IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Butt fusion of 3/4" PE - Joiner(s) Qualified OPS 309 Mechanical fittings (couplers) - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (2354 Caliber Place, Blackfoot, ID) Correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, mechanical fittings (couplers), tracer wire, pressure test, squeeze off, bedding, backfill and continuity tests. Quizzed employees on ADCs of squeeze off procedures. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Observations Included: (2355 & 2374 Caliber Place, Blackfoot, ID) Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, inspected completed butt fusions of fused T, mechanical fittings (couplers), tracer wire, pressure test, squeeze off, bedding, backfill and continuity tests. Quizzed employees on AOCs of butt fusion procedures. This service line is a branch service line feeding four services on one EFV 2600 and using a two-meter manifold connected to each service line. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Discrepancies: The crew found inadequate separation of the stub from an electrical conduit crossing. The District Operations Coordinator was notified and advised the crew to wrap the service line with rock shield to comply with OPS 307 Section 5.16.2.1. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: 250326 Signature: _Y — Signature: c�0 3 s i' IPUC Form 4 Rev. 12/10/2024