HomeMy WebLinkAboutIntermountain Gas 250326 Blackfoot Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 250326
Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160
Address: 2354, 2355, 2374 Caliber Place City/District: Blackfoot
Contractor/Job#: W012076366 Foreman: Operator Supervisor: Austin Stewart
W012076359,W012076832 Scott Millard
Job Description: '/" Service Line(s) System Type: Z GD ❑ GT ❑ GG
One-Call Ticket: 2025122893, 2025122892, 2025122902 Total Inspection Days: 1.0
Tasks: Procedure# Rating Comments
1. Materials—Handling, Storage, Labeling OPS 11 SAT V PE dated 12/2022
2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches
OPS 322
3. Bedding/Backfill OPS 308 SAT Sand used
SF 418
4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge used for open trench
OPS 322
5. Valve Installation OPS 703 N/A
6. Coating Condition OPS 401 N/A
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type OPS 505 SAT 95/96 PSI for 15 min
9. OQ Qualifications OPS 800 SAT Verified
10. Casing Seal/Installation OPS 325 N/A
11. Service Line Installation OPS 302 SAT
12. Tie-In/Hot Tapping OPS 600 N/A
13. Meter Location/Regulator Testing OPS 302 SAT 3 feet meter separation
14. Equipment Calibration Verification OPS 501 SAT Verified
15. EFV Installation OPS 301 SAT EFV 2600 pre-installed with main
16. MAOP OPS 602 N/A
OPS 606
OPS 900
OPS 1000
17. Purge OPS 603 N/A
18. Safety Equipment SF 418 SAT Fire Extinguisher& JSA
SF 422
19. Abandonment OPS 607 N/A
20. Line Locating OPS 611 SAT Hand dig to locate stub on second
IPUC Form 4 Rev. 12/10/2024
IPUC Construction Inspection
21. Plastic Pine OPS 307 SAT Butt fusion of 3/4" PE
- Joiner(s) Qualified OPS 309 Mechanical fittings (couplers)
- Fusion Tools OPS 325
- Squeezing OPS 800
- Heat Plate
- Joining Procedure
22. Steel Pine OPS 200 N/A
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
Additional Comments:
Observations Included: (2354 Caliber Place, Blackfoot, ID) Correct trench depth, safety equipment,
verification OQ records, verification equipment calibrations, mechanical fittings (couplers), tracer wire,
pressure test, squeeze off, bedding, backfill and continuity tests. Quizzed employees on ADCs of squeeze
off procedures. All observed procedures were completed in accordance with IGC Operations and
Maintenance Manual.
Observations Included: (2355 & 2374 Caliber Place, Blackfoot, ID) Line locating, correct trench depth,
safety equipment, verification OQ records, verification equipment calibrations, inspected completed butt
fusions of fused T, mechanical fittings (couplers), tracer wire, pressure test, squeeze off, bedding, backfill
and continuity tests. Quizzed employees on AOCs of butt fusion procedures. This service line is a branch
service line feeding four services on one EFV 2600 and using a two-meter manifold connected to each
service line. All observed procedures were completed in accordance with IGC Operations and
Maintenance Manual.
Discrepancies: The crew found inadequate separation of the stub from an electrical conduit crossing. The
District Operations Coordinator was notified and advised the crew to wrap the service line with rock shield
to comply with OPS 307 Section 5.16.2.1.
Corrective Action Required: ❑ Yes ® No Compliance Letter#:
Lead Inspector: Galli Date: Reviewer: Brooks Date:
250326
Signature: _Y — Signature: c�0 3 s
i'
IPUC Form 4 Rev. 12/10/2024