Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250325 Idaho Falls Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 250325 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 2545 Broadway Street City/District: Idaho Falls Contractor/Job#: W012069533 Foreman: Operator Supervisor: Jake Hunter Jeff Baird Job Description: 4" STL Main to 2" PE Main System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025120348 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2" PE dated 8/2024 2. Trenching/Boring—Depth, Clearance OPS 308 SAT STL 4" main at 48" OPS 322 PE 2" main bored at a min of 36" 3. Bedding/Backfill OPS 308 SAT Sand used in roadway around SF 418 welded transition fitting 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge used for open trench OPS 322 12-2auge used for bore 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT Coal tar coating in good condition OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 99 PSI for 1 hour 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 SAT Hot tap to 4" main 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher & JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate main IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Butt fusion of 2" PE - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 SAT Welded from a 4" STL main - Welder(s) Qualified OPS 201 to a 2" PE transition fitting Pipe/Coating—Inspected/Repaired OPS 202 UT - .183" - Cathodic Protection OPS 306 Wax wrap -Non-Destructive Testing OPS 401 321b anode - Welding Procedures OPS 407 Removal and disposal of coal tar - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (2545 Broadway Street, Idaho Falls, ID) Traffic control, line locating, correct trench and bore depth, safety equipment, verification OQ records, verification equipment calibrations, trenching,boring and pullback, removal and disposal of coal tar wrap, butt fusion, UT reading of.183" at weld location, SMAW welding, tracer wire, installation of two Maloney posts, pressure test, 321b sacrificial anode, wax wrap, bedding and backfill. Quizzed employees on AOCs of manual butt fusion. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: 250325 Signature: Signature: �L5 IPUC Form 4 Rev. 12/10/2024