HomeMy WebLinkAboutIntermountain Gas 250319 Boise Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 250319 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 2237 & 2211 S Janeen St City/District: Boise Contractor/Job #: W012027563, Foreman: Operator Supervisor: Jose Galvan W012026491 Jesus Garcia Job Description: '/" Service Line(s) from 2" STL Main System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025112596, 2025112595 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Steel main at 3611, Bored service OPS 322 along street at min 30" 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge used for open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A Did not observe 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200s for both services 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher& JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate stub. IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Butt fusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (2237 & 2211 S Janeen St, Boise, ID) Line locating, potholing, boring, correct trench and bore depth, safety equipment, verification OQ records, verification equipment calibrations, butt fusion and tracer wire. Quizzed employees on applicable AOCs of butt fusion procedures. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. When the 2" STL main was day lighted the crew observed a prior line strike that had bent the pipe. The District Operations Coordinator was notified and requested an IGC welder to remove the wrap and inspect the pipe for dents and external corrosion. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: 250319 Signature: Signature: a,50-:1 4's IPUC Form 4 Rev. 12/10/2024