Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250318 & 250320 Boise Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 18(.5)/20(1.0) March 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 8173 W Salt Creek Rd City/District: Boise Contractor/Job: 425-10057 Foreman: Operator Supervisor: None G. Gomez Job Description: 2" double feed extension System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025111699 Total Inspection Days: 1.5 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Boring OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT Bore wire OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Potholing/Excavating IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Fusing - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 8173 W Salt Creek Rd Boise, Idaho Observations: • Safety equipment was verified. • Verification of OQ records. • Fusing and Purging • Performed potholing/excavation and sidewalk slab removal for line locating and boring. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: rkins Date: Reviewer: Brooks Date: 250320 Signature: 7 Signature: 03 IPUC Form 4 Rev. 12/10/2024