Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250317 Nampa Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 250317 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: 3702 E Comstock Ave City/District: Nampa Contractor/Job #: W012013619 Foreman: Operator Supervisor: None Wyatt Duncan Job Description: '/" Service Line(s) System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025093326 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring Stub at approx.—Depth, Clearance OPS 308 36 inches. OPS 322 24 inch service line. 3. Bedding/Backfill OPS 308 SAT Sand used for service line. SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A Did not observe 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher & JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate stub. IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Butt fusion - Joiner(s) Qualified OPS 309 Stab fittings - Fusion Tools OPS 325 Squeeze off(did not observe release) - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (3702 E Comstock Ave, Nampa, ID) Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, mechanical fittings (coupler) installation, butt fusion, tracer wire, squeeze off(did not observe release) and bedding. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: 250317 Signature: i Signature: asa3aS I IPUC Form 4 Rev.12/10/2024