Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250313 Nampa Construction
IPUC Construction Inspection Inspector(s): GaW Date(s): 250313 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: 4697 E Pondera Dr, 4597 E Fortuna Dr City/District: Nampa Contractor/Job #: W012029362, Foreman: Operator Supervisor: None 049105-371 Pedro Velazquez Job Description: 3/" Service Line(s) System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025101375, 2025101363 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100/100 PSI for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning purge 18. Safety Equipment SF 418 SAT Fire Extinguisher&JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 6 11 SAT Continuity test, Hand dig on 2nd IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Butt fusion - Joiner(s) Qualified OPS 309 Stab fittings - Fusion Tools OPS 325 Squeeze off - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (4697 E Pondera Dr, Nampa, ID) Correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, mechanical fittings(coupler) installation, inspected completed butt fusion for proper rollback, tracer wire, pressure test, squeeze off, cleaning purge, bedding, backfill and continuity test. Quizzed employees on applicable AOCs of squeeze off procedures. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Observations Included: (4597 E Fontuna Dr, Nampa, ID) Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, mechanical fittings (coupler) installation, tracer wire, pressure test, squeeze off, cleaning purge, bedding and backfill. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes M No Compliance Letter#: Lead Inspector: GaUi Date: Reviewer: Brooks Date: 250313 Signature: Signature: IPUC Form 4 Rev. 12/10/2024