Loading...
HomeMy WebLinkAboutIntermountain Gas 250312 Meridian Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 12 March 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 191 W Archfield St City/District: Meridian Contractor/Job: W012010058 Foreman: Operator Supervisor: None Jose Rodriguez Job Description: 2" Service System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025062081 Total Inspection Days: 1.0 Tasks. Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. BeddingBackfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 SAT 5500 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 xev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Fusing -Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 191 W Archfield St, Meridian, Idaho Observations: • Safety equipment was checked. • Verification of OQ records. • Performed fusing of EFV and riser • Trenching • Quizzed the employee on handling times after fusing and separation requirements for multiple lines. Corrective Action Required: ❑ Yes N No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: f 250312 Signature;�;� ��_ Signature: 0_3 IPUC Form 4 Rev.12/10/2024