Loading...
HomeMy WebLinkAboutIntermountain Gas 250303 Kuna Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 3 March 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Arroyo Vista Subdivision-Hubbard/Ten Mile City/District: Kuna Contractor/Job#: 375-0462 Foreman: Operator Supervisor: None S. Gray Job Description: 2" Main Install-Backbone System Type: ® GD ❑ GT ❑ GG One-Call Ticket: N/A-No digging took place Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 N/A OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 N/A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Fusing - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: Arroyo Vista Subdivision-Hubbard/Ten Mile, Kuna, Idaho Observations Included: Safety equipment, verification OQ records and fusing. Quizzed employee on rough handling times after fusing. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Pe ns Date: Reviewer: Brooks Date: 250303 Signature: Signature: k- 'Z6 03 O IPUC Form 4 Rev. 12/10/2024