Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250303 Kuna Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 3 March 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Arroyo Vista Subdivision-Hubbard/Ten Mile City/District: Kuna Contractor/Job#: 375-0462 Foreman: Operator Supervisor: None S. Gray Job Description: 2" Main Install-Backbone System Type: ® GD ❑ GT ❑ GG One-Call Ticket: N/A-No digging took place Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 N/A OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 N/A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Fusing - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: Arroyo Vista Subdivision-Hubbard/Ten Mile, Kuna, Idaho Observations Included: Safety equipment, verification OQ records and fusing. Quizzed employee on rough handling times after fusing. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Pe ns Date: Reviewer: Brooks Date: 250303 Signature: Signature: k- 'Z6 03 O IPUC Form 4 Rev. 12/10/2024