Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250303 & 250305 Jerome Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 250303 & 250305 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 2109 & 2113 Regan St City/District: Jerome Contractor/Job #: W012038772 Foreman: Operator Supervisor: None W012038740 Lyle Hawkins Job Description: %" Service Line(s) System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025082419, 2025082426 Total Inspection Days: 1.5 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill lOPS 308 SAT No sand needed S 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 98 PSI for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 ISAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 N/A IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Stab fittings =_ - Joiner(s) Qualified OPS 309 Squeeze off - Fusion Tools OPS 325 - - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: March 3rd,2025: Inspector Galli travelled to the Twin Falls District to conduct a construction inspection in Jerome;ID. Observations Included: (2109 & 2113 Regan St, Jerome, ID) (Split Service) Correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, mechanical fittings (coupler& T) installation, tracer wire, pressure test, squeeze off and bedding. Unable to backfill due to pending Idaho Power inspection. Quizzed employees on applicable AOCs of squeeze off procedures. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. March 511, 2025: Inspector Galli travelled back to Boise, ID. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: 250305 Signature: Signature: -X5 IPUC Form 4 Rev. 12/10/2024