HomeMy WebLinkAboutIntermountain Gas 250227 Star Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 27 Feb 2025
Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160
Address: 8847 W Moon River Dr City/District: Star
Contractor/Job #: W012005128 Foreman: Operator Supervisor: None
M. Krebbs
Job Description: 3/" Service Install System Type: ❑X GD ❑ GT ❑ GG
One-Call Ticket: 2025061963 Total Inspection Days: 1.0
Tasks: Procedure# Rating Comments
1. Materials—Handling, Storage, Labeling OPS 11 SAT
2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24"
OPS 322
3. Bedding/Backfill OPS 308 SAT Sand/Native
SF 418
4. Pipe Installation(Tracer Wire) OPS 308 SAT
OPS 322
5. Valve Installation OPS 703 N/A
6. Coating Condition OPS 401 N/A
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type OPS 505 SAT 94 PSI 15 Minutes
9. OQ Qualifications OPS 800 SAT
10. Casing Seal/Installation OPS 325 N/A
11. Service Line Installation OPS 302 SAT And stub
12. Tie-In/Hot Tapping OPS 600 N/A
13. Meter Location/Regulator Testing OPS 302 N/A
14. Equipment Calibration Verification OPS 501 SAT Dates in file
15. EFV Installation OPS 301 SAT 1200
16. MAOP OPS 602 N/A
OPS 606
OPS 900
OPS 1000
17. Purge OPS 603 SAT
18. Safety Equipment SF 418 SAT
SF 422
19. Abandonment OPS 607 N/A
20. Line Locating OPS 611 SAT
IPUC Form 4 Rev.12/10/2024
IPUC Construction Inspection
21. Plastic Pine OPS 307 SAT Fusing/Stab fittings and fused
-Joiner(s) Qualified OPS 309 stubs with caps while waiting
- Fusion Tools OPS 325
- Squeezing OPS 800
- Heat Plate
- Joining Procedure
22. Steel Pipe OPS 200 N/A
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
Additional Comments:
Address: 8847 W Moon River, Star, Idaho
Observations:
• Line Locating: Verified accuracy and adherence to safety protocols.
• Correct Trench Depth: Ensured trenches were dug to appropriate depth specifications.
• Bedding and Backfilling: Confirmed proper materials and techniques were used for bedding and
backfilling.
• Stab Fittings: Inspected the installation quality and security of stab fittings.
• Fusing: Assessed the fusing process to ensure proper execution and safety.
• Pressure Testing: Monitored the pressure testing procedures for compliance with standards.
• Purging: Verified proper purging techniques were used to remove air or contaminants.
• EFV Installation: Checked installation of Excess Flow Valves (EFVs) for functionality and safety.
• Safety Equipment: Ensured all required safety equipment was in use and properly maintained.
• Tracer Wire: Confirmed correct installation and connection of tracer wire.
• Verification of OQ Records: Reviewed and confirmed the validity of Operator Qualification(OQ)
records.
Additionally, the employee was quizzed about the following procedures:
• Squeezing Time Procedures
• Depth of Cover/Bedding
Corrective Action Required: ❑ Yes ® No Compliance Letter#:
Lead Inspector: Pe kins Date: Reviewer: Brooks Date:
250227
Signature: Signatu7�PP_
'1,5C-1-1 0q
IPUC Form 4 Rev. 12/10/2024