HomeMy WebLinkAboutIntermountain Gas 250227 Star Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 27 Feb 2025 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 8847 W Moon River Dr City/District: Star Contractor/Job #: W012005128 Foreman: Operator Supervisor: None M. Krebbs Job Description: 3/" Service Install System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025061963 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24" OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 94 PSI 15 Minutes 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT And stub 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 SAT 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Fusing/Stab fittings and fused -Joiner(s) Qualified OPS 309 stubs with caps while waiting - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 8847 W Moon River, Star, Idaho Observations: • Line Locating: Verified accuracy and adherence to safety protocols. • Correct Trench Depth: Ensured trenches were dug to appropriate depth specifications. • Bedding and Backfilling: Confirmed proper materials and techniques were used for bedding and backfilling. • Stab Fittings: Inspected the installation quality and security of stab fittings. • Fusing: Assessed the fusing process to ensure proper execution and safety. • Pressure Testing: Monitored the pressure testing procedures for compliance with standards. • Purging: Verified proper purging techniques were used to remove air or contaminants. • EFV Installation: Checked installation of Excess Flow Valves (EFVs) for functionality and safety. • Safety Equipment: Ensured all required safety equipment was in use and properly maintained. • Tracer Wire: Confirmed correct installation and connection of tracer wire. • Verification of OQ Records: Reviewed and confirmed the validity of Operator Qualification(OQ) records. Additionally, the employee was quizzed about the following procedures: • Squeezing Time Procedures • Depth of Cover/Bedding Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Pe kins Date: Reviewer: Brooks Date: 250227 Signature: Signatu7�PP_ '1,5C-1-1 0q IPUC Form 4 Rev. 12/10/2024