HomeMy WebLinkAboutIntermountain Gas 250123 Weiser Construction IPUC Construction Inspection Inspector(s): Galli/Brooks Date(s): 250123 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: 1690 W 711 City/District: Weiser Contractor/Job#: 002797-263 Foreman: Operator Supervisor: Monty Jose Rodriquez Job Description: %" Service Line(s) from 4" Main System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025031686 Total Inspection Days: 2 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 12 gauge bore wire OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to daylight 4" main IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 SAT - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (1690 W 71h Street, Weiser, ID) Line locating, hand dig to daylight service stub, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, inspected completed butt fusions, boring and pull back and tracer wire install. All observed procedures were conducted in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: GaIH Date: Reviewer: Brooks Date 250123 Signature: Signature: �S C zo q IPUC Form 4 Rev. 12/10/2024