Loading...
HomeMy WebLinkAbout20250304Exhibits 1-4.pdf This document was exported from Numbers. Each table was converted to an Excel worksheet.All other objects on each Numbers sheet were placed on separate worksheets. Please be aware that formula calculations may differ in Excel. Numbers Sheet Name Numbers Table Name Excel Worksheet Name Table 1 Exhibit 1. Schedule A Table 1 Exhibit 1, Schedule Table 1 Exhibit 1, Schedule B Table 1 Exhibit 1, Schedule C Table 1 Exhibit 2, Schedule A Table 1 Exhibit 2, Schedule B Table 1 Exhibit 2, Schedule C Table 1 Exhibit 3 Table 1 Exhibit 4 1 RATE BASE(SCHEDULE"A"ACCOUNT 101 PLANT IN SERVICE) Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 (A) (B) (C) Plant in Service(Annual Report, pg. 5) Known Pro Forma ACCT# DESCRIPTION Actual Changes* (A+ B) 1 301 Organization 2 302 Franchises and Consents 3 303 Land &Land Rights 4 304 Structures and Improvements 208,501.67 208,501.67 5 305 Collecting&Impounding Reservoirs 6 306 Lake, River&Other Intakes 7 307 Wells 123,779.56 123,779.56 8 308 Infiltration Galleries&Tunnels 9 309 Supply Mains 10 310 Power Generation Equipment 11 311 Power Pumping Equipment 193,056.01 193,056.01 12 320 Purification Systems 430,732.76 430,732.76 13 330 Distribution Reservoirs&Standpipes 14 331 Trans. &Distrib. Mains&Accessories 15 333 Services(IDEQ Facilities Plan) 40,000.00 40,000.00 16 334 Meters and Meter Installations 43,615.55 43,615.55 17 335 Hydrants 18 336 Backflow Prevention Devices 19 339 Other Plant&Misc. Equipment 12,366.20 12,366.20 20 340 Office Furniture and Equipment 21 341 Transportation Equipment 22 342 Stores Equipment 23 343 Tools, Shop and Garage Equipment 24 344 Laboratory Equipment 25 345 Power Operated Equipment 26 346 Communications Equipment 27 347 Miscellaneous Equipment 28 348 Other Tangible Property 29 TOTAL PLANT IN SERVICE 968,436.20 83,615.55 1,052,051.75 (Add lines 1 -28) *Attach detailed explanations and calculations showing the development of each"Known Change"to the test year data. Exhibit No. 1 Schedule A 1 RATE BASE(SCHEDULE"B"ACCUMULATED DEPRECIATION) Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 Accumulated Depreciation (Annual Report, pg.6) (A) (B) (C) Known Pro Forma ACCT# DESCRIPTION Actual Changes* (A+B) 1 304 Structures and Improvements 2 305 Collecting&Impounding Reservoirs 3 306 Lake, River&Other Intakes 4 307 Wells 5 308 Infiltration Galleries&Tunnels 6 309 Supply Mains 7 310 Power Generation Equipment 8 311 Power Pumping Equipment 9 320 Purification Systems 10 330 Distribution Reservoirs&Standpipes 11 331 Trans.&Distrib. Mains&Accessories 12 333 Services 13 334 Meters and Meter Installations 14 335 Hydrants 15 336 Backflow Prevention Devices 16 339 Other Plant&Misc. Equipment 17 340 Office Furniture and Equipment 18 341 Transportation Equipment 19 342 Stores Equipment 20 343 Tools, Shop and Garage Equipment 21 344 Laboratory Equipment 22 345 Power Operated Equipment 23 346 Communications Equipment 24 347 Miscellaneous Equipment 25 348 Other Tangible Property 26 TOTALS(Add Lines 1 -25) 218,727.57 46,783.00 265,510.57 *Attach detailed explanations and calculations showing the development of each"Known Change"to the test year data. Exhibit No. 1 Schedule B 1 RATE BASE(SCHEDULE"C"SUMMARY) Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 (A) (B) (C) Test Year Known Pro Forma Actual Changes* (A+ B) 1 Total Plant in Service(Ex 1, Sch A, line 29) 968,436.20 83,615.55 1,052,051.75 2 Accumulated Depreciation (Ex 1, Sch B, line 26) 265,510.57 265,510.57 3 Net Plant in Service(Line 1 less line 2) 702,925.63 83,615.55 786,541.18 4 Add Utility Plant Acquisition Adjustment** (Annual Report page 7, line 5) 5 Add Materials&Supplies Inventories (Annual Report page 7, line 22) 6 Less Accum Amortization Util Plant Acq Adj** (Annual Report page 7, line 12) 7 Less Customer Advances for Construction (Annual Report page 8, line 22) 8 Less Contributions in Aid of Construction (Annual Report page 8, line 27) 9 Add Working Capital (1/8 Operating Expenses) (Exhibit No. 2, Sch B, line 22/8) 10 Add Deferred Charges(If any, attach detail) (Annual Report page 7, lines 29&30) ADJUSTMENT FOR NON-DEVELOPER PROPERTIES 76.97% 605,400.75 11 TOTAL RATE BASE 702,925.63 605,400.75 *Attach detailed explanations and calculations showing the development of each"Known Change" to the test year data. **Only if Commission approved. Exhibit No. 1 Schedule C 1 OPERATING RESULTS(SCHEDULE"A"REVENUES) Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 (A) (B) (C) Test Year Known Pro Forma (See Annual Report page 3) Actual Changes* (A+ B) Water Revenues: 1 Unmetered 127,583.50 127,583.50 2 Metered-Residential 3 Metered-Commercial&Industrial 4 Fire Protection Revenue 5 Other Water Sales Revenue 6 Irrigation Sales Revenue 7 Sales for Resale 8 Total Water Revenue(Add lines 1 -7) 9 DEQ Fees billed separately to customers 10 Hook-up or Connection Fees collected 455.50 455.50 11 Commission-approved Surcharges collected 12 TOTAL REVENUE(Add lines 8- 11) 128,039.00 128,039.00 *Attach detailed explanations and calculations showing the development of each"Known Change" to the test year data. Exhibit No. 2 Schedule A 1 OPERATING RESULTS (SCHEDULE"B" EXPENSES) Company Name: TIC Utilities LLC (The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 (A) (B) (C) Test Year Known Pro Forma (See Annual Report page 3) Actual Changes" (A+ B) 1 Labor-Operation &Maintenance 23,818.44 23,818.44 2 Labor-Customer Accounts 3 Labor-Administrative&General 4,825.76 4,825.76 4 Salaries-Officers& Directors 48,000.00 48,000.00 5 Employee Pensions&Benefits 6 Purchased Water 7 Purchased Power& Fuel for Power 22,671.25 22,671.25 8 Chemicals 9 Materials&Supplies-Operation & Maintenance 111,178.52 111,178.52 10 Materials&Supplies-Admin &General 1,063.72 1,063.72 11 Contract Services-Professional 16,881.69 16,881.69 12 Contract Services-Water Testing 13 Rentals-Property&Equipment 14 Transportation Expense 15 Insurance 2,511.95 2,511.95 16 Advertising 17 Rate Case Expense(Amortization) 18 Regulatory Comm. Exp. (Other Except Taxes) 19 Bad Debt Expense 20 Miscellaneous Expenses/Property Taxes 1,085.00 1,900.00 2,985.00 21 TOTAL OPERATING EXPENSES 184,036.33 49,900.00 233,936.33 "Attach detailed explanations and calculations showing the development of each "Known Change"to the test year data. Exhibit No. 2 Schedule B 1 OPERATING RESULTS(SCHEDULE"C" INCOME STATEMENT) Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 (A) (B) (C) Test Year Known Pro Forma Actual Changes* (A+B) 1 Revenue(From Ex.2,Sch A) 128,039.00 128,039.00 2 Operating Expenses(From page 3, line 33) 184,036.33 49,900.00 233,936.33 3 Depreciation Expense 46,783.00 46,783.00 4 Amortization, Utility Plant Acquisition Adj. 5 Amortization Exp.-Other 6 Regulatory Fees(PUC) 7 Property Taxes 8 Payroll Taxes 9A Other Taxes(list) DEQ Fees 9B 9C 9D 10 Federal Income Taxes 11 State Income Taxes 12 Provision for Deferred Income Tax-Federal 13 Provision for Deferred Income Tax-State 14 Provision for Deferred Utility Income Tax Credits 15 Investment Tax Credits-Utility 16 Total Expenses from Operations before interest(Add lines 2 230,819.33 49,900.00 280,719.33 17 Income from Utility Plant Leases to Others 18 Gains(Losses)from Disposition of Utility Plant 19 Net Operating Income(Add lines 1, 17&18 less line 16) -102,780.33 -49,900.00 -152,680.33 201 Revenues, Merchandizing,Jobbing&Contract Work 21 Expenses, Merchandizing,Jobbing&Contracts 22 Interest&Dividend Income 23 Allowance for funds used during construction 24 Miscellaneous Non-Utility Income 25 Miscellaneous Non-Utility Expense 26 Other Taxes, Non-Utility Operations 27 Income Taxes, Non-Utility Operations 28 Net Non-Utility Income(Add lines 20,22,23,&24 less lines 21,25,26&27) 29 Gross Income(Add lines 19&28) -102,780.33 -49,900.00 -152,680.33 30 Interest Exp. On Long-Term Debt 31 Other Interest Charges 32 NET INCOME(Line 29 less lines 30&31) -102,780.33 -49,900.00 -152,680.33 *Attach detailed explanations and calculations showing the development of each"Known Change" to the test year data. Exhibit No.2 Schedule C 1 COST OF CAPITAL AND RATE OF RETURN Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 554 Test Year ended: 2024 (A) (B) (C) (D) Amount %of Total Cost Weighted Outstanding Outstanding of Cost (Column A/ Capital (Column B X Total Line 6) Column C) 1 Common Equity(Proprietor Capital Paid In) 785,771.80 21 Retained Earnings 31,885.95 3 Total Common Equity(Proprietor Capital)Line 1 + Line 2 817,657.75 100% 12% 12% 4 5 Long-Term Debt 6 Total Capital 817,657.75 7 Weighted Cost of Capital (Rate of Return Required) 12% (Line 3+5) Exhibit No. 3 1 REVENUE REQUIREMENT Company Name: TIC Utilities LLC(The Idaho Club) Idaho PUC Case Number: 544 Test Year ended: 2024 (A) (B) (C) Test Year Known Pro Forma Actual Changes (A+B)*ADJ 1 Rate Base(Ex. 1, Sch C, line 11)(NOTE 1) 702,925.63 83,615.55 605,400.75 2 Required Rate of Return (Ex. 3, line 7) 12% 12% 3 Income Required (Line 1 x Line 2) 84,351.08 72,648.09 4 Income Realized (Ex.2, Sch C, line 29) -102,780.33 -49,900.00 -152,680.33 5 Income Deficiency(Line 3 less Line 4) 187,131.41 225,328.42 6 Revenue to Overcome Losses 152,680.33 7 Regulatory Fees Gross up 504.54 8 Revenue Needed to Overcome Loss 153,184.87 9 Net Operating Income Required 72,648.09 10 Gross Up Factor 11.346594 11 Revenue Requirement for Net Income 97,827.50 12 Revenues at Existing Rates 0.00 13 Total Revenue Requirement 251,012.37 14 Percent Increase Required Net to Gross Multiplier 15 Total Gross Revenues 11.000000 16 Less Regulatory Fees(percentage) 0.001982 17 State Income Tax Rate 5.80% 0.058000 18 Total Expenses 0.059982 19 Federal Income Tax Base 0.940018 20 Federal Income Tax Rate 21% 0.197404 21 Net Operating Revenue 0.74261422 0.742614 22 Net Income to Gross Revenue Multiplier 1.34659419799 1.346594 NOTE 1: ADJUSTMENT FOR NON-DEVELOPER PROPERTIES=76.97% Exhibit No.4 1