HomeMy WebLinkAboutIntermountain Gas 250213 Star Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 13 Feb 2025 Company/Owner: Intermountain Gas Company (IGC) l Unit/OPID: 8160 Address: 8569 W Sugar Hill St City/District: Star Contractor/Job #: 09809-367 Foreman: Operator Supervisor: None KC Osmus Job Description: %" Service Install System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025070147 Total Inspection Days: .5 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding only 25' SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT Only 25' OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 1 Only 25' 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Fused pipe to riser, only witnessed - Joiner(s) Qualified OPS 309 25' of pipe being installed due to -Fusion Tools OPS 325 crew getting called off job for bad - Squeezing OPS 800 weather. - Heat Plate -Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 8569 W Sugar Hill St, Star, Idaho Observations: • Line Locating: Properly executed to ensure accurate pipeline installation. • Trench Depth: Verified to meet specifications and requirements. • Bedding: Adequate bedding material used to provide support and stability. • Fusing: Fusion joints inspected and confirmed for quality and integrity. • Safety Equipment: All necessary safety equipment deployed and in use. • Tracer Wire: Installation of tracer wire verified for future location purposes. • OQ Records: Verification of Operator Qualification(OQ)records completed. Additional Note: • Weather Impact: Due to inclement weather conditions, the job was halted and crews were instructed to return to the shop. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250213 Signatur/, ' Signature: IPUC Form 4 Rev. 12/10/2024