HomeMy WebLinkAboutIntermountain Gas 250213 Star Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 13 Feb 2025
Company/Owner: Intermountain Gas Company (IGC) l Unit/OPID: 8160
Address: 8569 W Sugar Hill St City/District: Star
Contractor/Job #: 09809-367 Foreman: Operator Supervisor: None
KC Osmus
Job Description: %" Service Install System Type: ® GD ❑ GT ❑ GG
One-Call Ticket: 2025070147 Total Inspection Days: .5
Tasks: Procedure# Rating Comments
1. Materials—Handling, Storage, Labeling OPS 11 SAT
2. Trenching/Boring—Depth, Clearance OPS 308 SAT
OPS 322
3. Bedding/Backfill OPS 308 SAT Bedding only 25'
SF 418
4. Pipe Installation(Tracer Wire) OPS 308 SAT Only 25'
OPS 322
5. Valve Installation OPS 703 N/A
6. Coating Condition OPS 401 N/A
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type OPS 505 N/A
9. OQ Qualifications OPS 800 SAT
10. Casing Seal/Installation OPS 325 N/A
11. Service Line Installation OPS 302 SAT 1 Only 25'
12. Tie-In/Hot Tapping OPS 600 N/A
13. Meter Location/Regulator Testing OPS 302 N/A
14. Equipment Calibration Verification OPS 501 SAT Dates in file
15. EFV Installation OPS 301 N/A
16. MAOP OPS 602 N/A
OPS 606
OPS 900
OPS 1000
17. Purge OPS 603 N/A
18. Safety Equipment SF 418 SAT
SF 422
19. Abandonment OPS 607 N/A
20. Line Locating OPS 611 SAT
IPUC Form 4 Rev. 12/10/2024
IPUC Construction Inspection
21. Plastic Pipe OPS 307 SAT Fused pipe to riser, only witnessed
- Joiner(s) Qualified OPS 309 25' of pipe being installed due to
-Fusion Tools OPS 325 crew getting called off job for bad
- Squeezing OPS 800 weather.
- Heat Plate
-Joining Procedure
22. Steel Pine OPS 200 N/A
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
Additional Comments:
Address: 8569 W Sugar Hill St, Star, Idaho
Observations:
• Line Locating: Properly executed to ensure accurate pipeline installation.
• Trench Depth: Verified to meet specifications and requirements.
• Bedding: Adequate bedding material used to provide support and stability.
• Fusing: Fusion joints inspected and confirmed for quality and integrity.
• Safety Equipment: All necessary safety equipment deployed and in use.
• Tracer Wire: Installation of tracer wire verified for future location purposes.
• OQ Records: Verification of Operator Qualification(OQ)records completed.
Additional Note:
• Weather Impact: Due to inclement weather conditions, the job was halted and crews were
instructed to return to the shop.
Corrective Action Required: ❑ Yes ® No Compliance Letter#:
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
250213
Signatur/, ' Signature:
IPUC Form 4 Rev. 12/10/2024