HomeMy WebLinkAboutIntermountain Gas 250130 - 250213 Meridian Project Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 250130 (0.5), 250211 (0.5), 250213 (1.0) Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: Lake Hazel and Eagle Intersection City/District: Meridian Contractor/Job#: 425-10011 Foreman: Operator Supervisor: 0�1� Kobi Voyson None— 5B Job Description: 4" Main Extension System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025042211 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher & JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to daylight main IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Butt Fusion - Joiner(s) Qualified OPS 309 Electrofusion - Fusion Tools OPS 325 Squeeze off below 32 degrees—3:38 - Squeezing OPS 800 Release below 32 degrees-14:32 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (Lake Hazel and Eagle Intersection, Meridian, ID) Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, inspected butt fusion process on 4"PE, electrofusion coupler of 4" PE, ran a 3/" aboveground bypass and then replaced with 2" aboveground bypass due to low pressure issue in the adjacent neighborhood, tracer wire, squeeze off, partial bedding and backfill. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: tJA Lead Inspector: Galli Date: Reviewer: Brooks Date: �- 250213 Signature: ��1 �' Signature: tea- g i IPUC Form 4 Rev. 12/10/2024