HomeMy WebLinkAboutIntermountain Gas 250211 IPUC Form 1 - Fireside IPUC Pipeline Safety Inspection
Inspector(s): Brooks, Perkins, Galli Date(s): 250211
Company/Owner: Intermountain Gas Company Unit/OPID: 08160
Standard: N Training: ❑ TIMP/DIMP: ❑ OQ. ❑
Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 1.5
Inspection Summary
February 11, 2025: (1.5 Standard) (Brooks 0.5) (Perkins 0.5) (Galli 0.5)
IPUC inspector Brooks, Perkins, Galli and Executive Director Barrett-Riley attended a fireside meeting
with IGC representatives out of the Boise Office.
Topics covered by
1. Safety Moment.
2. Update on Utility Group structure changes, Future State.
3. Treasure Valley area odor calls, update on IGC website.
4. Picarro (AMLD)update.
5. RNG Interconnect Agreements update.
6. GIS Maps for IPUC
7. FOCs are District Operation Coordinators (Project Managers)
8. Communication—Primary Contact is still Colby Lundstrom
IPUC inspectors can call District Operation Coordinators for immediate safety concerns
9. MDU hired a primary OQ Manager
Topics covered by IPUC:
I. Regulatory updates with the new Presidential Administration
2. Considerations with a park and roadway being built near the Nampa LNG Plant
3. 60106 Agreement Change
4. Invitation to the 2025 Tri-Annual
5. New Commissioner Update
6. Recent odor calls throughout the Treasure Valley
Corrective Action Required: ❑ Yes N No Compliance Letter#: NA
Follow Up Required: ❑ Yes N No By Date: NA
Lead Inspector: Gatti Date: Reviewer: Brooks Date:
250211 1SOZ�$
Signature: Signature:
IPUC Form 1 Rev.12/11/2024