Loading...
HomeMy WebLinkAboutIntermountain Gas 250130 IPUC Form 1 - Kuna Line Strike Construction IPUC Pipeline Safety Inspection Inspector(s): Galli(0.5), Perkins (0.5) Date(s): 250130 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug &Alcohol: ❑ Inspection Days: 1.0 Inspection summary January 30, 2025: (1.0 Standard) (Galli 0.5)(Perkins 0.5) At approximately 1130 hours, IPUC Inspector Galli arrived at 1091 N Rockdale Way, Kuna, ID,to discover a gas leak resulting from a line strike by a Dasco employee. The Dasco team had already notified IGC, Dasco leadership, and emergency services (911). When IGC Service Technicians and Crews assessed the situation, it was determined that two sections of the main needed to be squeezed off due to the location of the line strike. After the main was squeezed off, a new section of the service line was installed and pressure tested at 95 psi for 15 minutes. The main line was released and backfilled at approximately 1445 hours. The dig ticket number was 2025051736. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Follow Up Required: ❑ Yes ® No By Date: NA Lead Inspector: Gatti Date: Reviewer: Brooks Date: 250130 Signature: ��-/ � Signature: IPUC Form 1 Rev. 12/11/2024