HomeMy WebLinkAboutIntermountain Gas 250128-29 Caldwell Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 28-29 January 2025
Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160
Address: 19127 Red Label Ln Ste 101-108 City/District: Caldwell
Contractor/Job#: 053345-317 Foreman: Operator Supervisor:
J. Garcia /Vem- S e Q'5 per,9
Job Description:2" Service install off%" high pressure System Type: 0 GD ❑ GT ❑ GG
One-Call Ticket: 2025040911 Total Inspection Days: 2
Tasks: Procedure# Rating Comments
1. Materials-Handling, Storage, Labeling OPS 11 SAT
2. Trenching/Boring-Depth, Clearance OPS 308 SAT
OPS 322
3. Bedding/Backfill OPS 308 SAT
_ SF 418
4. Pipe Installation (Tracer Wire) OPS 308 SAT
OPS 322
5. Valve Installation OPS 703 SAT 2" curb Valve
6. Coating Condition OPS 401 SAT %" service line coating in like new
OPS 403 condition
7. Manuals-Field Procedures, O &M SAT
8. Testing-Pressure, Duration, Type OPS 505 N/A
9. OQ Qualifications OPS 800 SAT
10. Casing Seal/Installation OPS 325 N/A
11. Service Line Installation OPS 302 SAT
12. Tie-In/Hot Tapping OPS 600 SAT V welded on tapping tee
13. Meter Location/Regulator Testing OPS 302 N/A
14. Equipment Calibration Verification OPS 501 SAT Dates in file
15. EFV Installation OPS 301 SAT 2" curb Valve
16. MAOP OPS 602 SAT 330PSI :Y" service line to 2" service
OPS 606 line at 60PSI
OPS 900
OPS 1000
17. Purge OPS 603 N/A
18. Safety Equipment SF 418 SAT
SF 422
19. Abandonment OPS 607 N/A
20. Line Locating OPS 611 SAT
IPUC Form 4 Rev.12/10/2024
IPUC Construction Inspection
21. Plastic Pine OPS 307 SAT Fusing =_
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 325
- Squeezing OPS 800
-Heat Plate
- Joinin Procedure
22. Steel Pine OPS 200 SAT Welded on V tapping tee,
- Welder(s) Qualified OPS 201 coating/wrap applied
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
Additional Comments:
Address: 19127 Red Label Ln Ste 101-108 Caldwell, Idaho
Observations Included: Line locating, correct trench depth, bedding, backfilling, fusing,welding, wrapping/
coating, purged 2" coiled roll, curb valve installation, safety equipment, tracer wire, verification OQ
records. The contractor was having trouble confirming wall thickness prior to welding on tapping tee so
they called out IGC to come confirm with their equipment.
Corrective Action Required: ❑ Yes ® No Compliance Letter#:
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
250129
Signature: Signature: -13 C?
IPUC Form 4 Rev. 12/10/2024