Loading...
HomeMy WebLinkAboutIntermountain Gas 250128 Nampa Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 250128 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 5648 E Garby St City/District: Nampa Contractor/Job#: 53862-371 Foreman: Operator Supervisor: BLS Jon Hammer NO hk- �0�- Job Description: 3/" Service Line(s) System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025031629 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 98 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning Purge 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Mechanical Fitting - Joiner(s) Qualified OPS 309 Butt Fusion -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 -Exothermic Welding OPS 403 Additional Comments: Observations Included: (5648 E Garby St, Nampa, ID) Correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, inspected completed butt fusions,mechanical fittings (coupler), tracer wire, successful pressure test, cleaning purge, squeeze off, bedding, backfill and continuity testing. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes M No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: 250128 A Signature: Signature: r/ Oa Ig IPUC Form 4 Rev.12/10/2024