Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250121 Meridian Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 250121 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 6991, 6997, 7026 S Palatino Ave City/District: Meridian Contractor/Job#: 117543-425 Foreman: Operator Supervisor: Monty 118712-425, 117557-425 German Gomez Job Description: %" Service Line(s) System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025010609,2025010608,2025010419 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand Used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT See additional comments 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Mechanical Fitting - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (6991 & 6997 S Palatino Ave, Meridian, ID) (Split Service) Correct trench depth, safety equipment, verification OQ records,verification equipment calibrations,purging, pressure testing(97 psi for 15 minutes), sleeve under driveway, tracer wire install, inspected completed butt fusions,mechanical fittings (couplers), EFV 1200 installation, bedding, backfilling and continuity test. Quizzed employee on squeeze times in cold temperatures. Observations Included: (7026 S Palatino Ave, Meridian, ID) Line locating, hand dig to daylight service stub, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, purging,pressure testing (96 psi for 15 min), sleeve under driveway, tracer wire install, mechanical fittings (couplers), EFV 1200 installation, bedding and backfilling. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli ate: Reviewer: Brooks jDate- 250121 Signature: Signature: L IPUC Form 4 Rev. 12/10/2024