Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250116 Nampa Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 16 January 2025 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 20455 Weymouth place, 11102 Trestle Rock City/District: Nampa st Contractor/Job #: 52128-317, 050452- Foreman: Operator Supervisor: None 317 W. Ray Job Description: '/" Service Installs System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2024490741, 2024530729 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 96/98 PSI-15 Min 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Dates in file 15. EFV Installation OPS 301 SAT 1200 EFV 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Fusing/Stab fittingsas built - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 20455 Weymouth place, 11102 Trestle Rock St, Nampa, Idaho Observations Included: Line locating, correct trench depth, bedding, backfilling, fusing, stab fittings, pressure testing,purging, EFV install, safety equipment, verification OQ records. Quizzed employee on squeeze time procedures and trench depths. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: ins Date: Reviewer: Brooks Date: 250116 Signature: Signature: Z-S 0 1 IPUC Form 4 Rev. 12/10/2024