Loading...
HomeMy WebLinkAboutIntermountain Gas 250114 Caldwell Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 250114 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: 11069 Canvas St, 17630 Mason Ridge Way City/District: Caldwell Contractor/Job #: 050034-317, Foreman: Operator Supervisor: None 051938-317 KC Osmus Job Description: %" Service Line(s) System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2024530812,2024530809 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand Used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 UNSA 94 psi for 15 min, 211 house UNSAT 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning Purge 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT -Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (11069 Canvas St) Correct trench depth, safety equipment, verification OQ records, verification equipment calibrations,purging,pressure testing, tracer wire install, fusing, mechanical fittings (couplers), squeeze off, EFV 1200 installation,bedding and backfilling. Quizzed employee on squeeze time procedures. Observations Included: (17630 Mason Ridge Way) Line Locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, locates markings verified, purging, pressure testing, tracer wire install, squeeze off, fusing, mechanical fittings (couplers), EFV 1200 installation, bedding and backfilling. Discrepancies: The pressure test conducted at 17630 Mason Ridge Way, Caldwell, ID, was attempted three times due to a leak on the pressure test equipment(tree).During the final attempt,the pressure test experienced a loss of approximately 2 psi within the 15-minute testing period. The IPUC inspector observed the small leak from one of the threaded connections on the tree and advised the OQ'd contractor accordingly. Despite the leak,the test was deemed successful by the OQ'd contractor,and the system was subsequently put into service. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202501 Lead Inspector: Galli Date: Reviewer: Brooks Date: 250114 Signature: Signature: 2.5012.E L IPUC Form 4 Rm 12/10/2024