Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250107.1 Meridian Construction
IPUC Construction Inspection Inspector(s): Brooks Date(s): 250107 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 5254 W McNair St City/District: Meridian Contractor/Job#: 48940-371 Foreman: Operator Supervisor: Will M. Krebbs On-Site: N Job Description: Install 3/" PE Service System Type: © GD ❑ GT ❑ GG One-Call Ticket: 530612 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 SAT 6. Coating Condition OPS 401 SAT OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 94 PSIG 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 NA 13. Meter Location/Regulator Testing OPS 302 NA 14. Equipment Calibration Verification OPS 501 SAT 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 NA OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 NA 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 NA - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install a 3/4" service line. Observations Included: Excavation, trench depths, safety equipment, verification of OQs, equipment calibration, stab fittings, tracer wire, butt fusions, EFV, purge, and dig ticket. Quizzed employees on applicable AOCs of OQ. All procedures were followed in accordance with IGC Operations and Maintenance Manuals. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Brooks Date: Reviewer: Date: 250107 Signature: 1� Signature: IPUC Form 4 Rev.12/10/2024