HomeMy WebLinkAboutEnbridge 241209 Form 1 IGC NTSB & IM Implementation Idaho PUC Pipeline Safety Inspection Summary
Inspector(s):I Galli I Date(s): 12/9/2024
Company/Owner: Enbridge I Unit#/OPID 12876
Inspection Type & Time (1 day, 0.5 day) Total Inspection Da s: 0.5
Standard:10.25 1 Training:I lIntegrity Management:1 0.25 1 Incident:
Follow-up: OQ: I I Damage Prevention: D&A:
Inspection Summary
December 9, 2024 (0.25 Standard):
IPUC inspector Galli reviewed the answers provided by Enbridge compliance personnel and observed no
discrepancies with the NTSB recommendations and recordkeeping of the Enbridge documents.
Decemeber 9, 2024 (0.25 IMP):
IPUC inspector Galli reviewed the answers provided by Enbridge compliance personnel and observed no
discrepancies with the TIMP implementation and recordkeeping of the Enbridge documents.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector (Lead):
Galli Date: 12/9/2024
Reviewer: `
Date:
Brooks
IPUC Form 1