Loading...
HomeMy WebLinkAboutEnbridge 241209 Form 1 IGC NTSB & IM Implementation Idaho PUC Pipeline Safety Inspection Summary Inspector(s):I Galli I Date(s): 12/9/2024 Company/Owner: Enbridge I Unit#/OPID 12876 Inspection Type & Time (1 day, 0.5 day) Total Inspection Da s: 0.5 Standard:10.25 1 Training:I lIntegrity Management:1 0.25 1 Incident: Follow-up: OQ: I I Damage Prevention: D&A: Inspection Summary December 9, 2024 (0.25 Standard): IPUC inspector Galli reviewed the answers provided by Enbridge compliance personnel and observed no discrepancies with the NTSB recommendations and recordkeeping of the Enbridge documents. Decemeber 9, 2024 (0.25 IMP): IPUC inspector Galli reviewed the answers provided by Enbridge compliance personnel and observed no discrepancies with the TIMP implementation and recordkeeping of the Enbridge documents. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector (Lead): Galli Date: 12/9/2024 Reviewer: ` Date: Brooks IPUC Form 1