Loading...
HomeMy WebLinkAboutEnbridge 2024 IPUC Form 1 - Enbridge-Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks Date(s): 09/30-10/1&8/2024 Company/Owner: Enbridge Unit#/OPID 112876 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4.5 Construction: Training: (T)(D)Integrity Management: Incident: Standard:F4.5 Gas Rule: F7 Follow-up: F-1 OQ: a Damage Prevention: E:1 D&A: El Inspection Summary Audit consisted of inspecting field operating equipment for the Enbridge Idaho inspection unit. September 30.2024: (2.0 Standard Prep/Travel) IPUC Inspectors traveled to Logan,Utah to conduct a field audit with Enbridge. October 1,2024: (2.0 Standard/Travel) IPUC inspectors Perkins and Brooks conducted a field audit of Enbridge Preston/Franklin District. Audit included: Verification of Jared Morton, Jonathan Krebs,Mike Thayne and JR Sharp OQ Records. Inspection assets included: 7 regulator stations, 12 control valves, 2 rectifiers, 3 carrier/casing and CP reads on all casings/reg stations. Reg station FC0001 and FC0005 had areas of minor corrosion and work order RA 312069 was initiated to correct. All of the equipment inspected was in satisfactory operating condition and performed within regulatory compliance requiremements. October 8 , 2024: (0.5 Standard post) Wrote the inspection report, completed audit forms: PHMSA IA question set including OQ protocol 9, IPUC Forms 1,Post-Inspection Written Preliminary Findings and attached inspection documents. Attached: IPUC Form 1, Inspection Summary Post-Inspection Written Preliminary Findings Supporting Document saved in file IPUC Field Equipment Status Worksheets PHMSA OQ Protocol 9 Corrective Action Required: Work Order RA312069 Yes X No Follow-up Required: by (date): Yes No X Inspector(Lead): Date: Perkins! 10/8/2024 Reviewer: Date: Brooks 10- 17-aq IPUC Form 1