Loading...
HomeMy WebLinkAboutAvista Avista Prep Days 2025 Idaho PUC Pipeline Safety Inspection Summary Inspector(s):I Galli Date(s): 11/4/2024 Company/Owner: Avista Utilities Unit#/OPID 131232 inspection Type & Time (1 day, 0.5 day) Total Inspection Days 1 Standard: 1 Training: Integrity Management: Incident: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary November 4, 2024 (1.0 Standard): IPUC inspector Galli prepped for the 2025 Avista Utilities field audits for the Lewiston, Moscow, Coeur D'Alene, Kellogg and Sandpoint districts. Corrective Action Required: Yes No X Follow-up Required: by(date): Yesl lNolX Inspector (Lead): Galli Date: 11/4/2024 Reviewer: Brooks Date: IPUC Form 1