Intermountain Gas 241217-18 Boise Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 12/17-18/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 2000 Yamill Rd Suite 100/101 City/District: Boise Contractor/Job#: Foreman: Employees: 118680-425,118682-425 G Gomez See lineup in file Job Description: 2" & %" PE Service Line(s) and System Type: ® Distribution ❑ Transmission HPSS off 4" steel main Operator Supervisor: One-Call Ticket: 2024480502 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24"trench OPS 322 3. Bedding/Backfill SAT OPS 308 Sand/Native soil used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation SAT OPS 703 Curb Valve 6. Coating Condition SAT OPS 401 Yellow coating on steel OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 300' steel line, 96 PE line 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 3/" and 2" 12. Tie-In/Hot Tapping SAT OPS 600 3/" Steel tapping tee 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 2" 16. MAOP SAT OPS 602 200 PSI OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SAT SF 418 Fire extinguisher and SF 422 JSA 19. Abandonment N/A I OPS 607 IPUC Form 4 Rev. 12/21/2023 I PUC Construction Inspection 20. Line Locating SAT OPS 611 Hand dig to find stub 21. Plastic Pipe SAT OPS 307 3/"-2"reducing coupler, - Joiner(s) Qualified OPS 309 2" EFV = -Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe SAT OPS 200 V tapping tee, welded - Welder(s) Qualified OPS 201 to %' steel line, curb Pipe/Coating—Inspected/Repaired OPS 202 valve & V -2" HPSS - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Address: 2000 Yamhill Rd Suite 100/101, Boise, Idaho Observations Included: Line locating, correct trench depth, fusing, stab fittings, safety equipment, verification OQ records, verification equipment calibrations, tracer wire install, mechanical fittings (couplers), fusing, curb valve installation, pressure test, purging, welding V tapping tee to 4"main and installing 3/"-2"HPSS, bedding and backfilling. Quizzed employee on digging depth and squeeze time procedures. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 12/18/2024 Perkins Reviewer: � � Date: /- 7•a5 Brooks IPUC Form 4 Rev. 12/21/2023