HomeMy WebLinkAbout20241226Final Approved Tariffs.pdf 0IQAM POWER.
Connie Aschenbrenner RECEIVED
Rate Design Senior Manager 2024 November 26 AM 9:50
caschenbrenner(cDidahopower.com IDAHO PUBLIC
UTILITIES COMMISSION
November 26, 2024
ELECTRONICALLY FILED
Monica Barrios-Sanchez, Secretary
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg 8,
Suite 201-A (83714)
PO Box 83720
Boise, Idaho 83720-0074
Re: Case No. IPC-E-24-23
Application for Approval of Amendments to the Energy Services Agreements with
Micron and Brisbie and Request for Updated Pricing Elements Based on the 2023
IRP
Dear Ms. Barrios-Sanchez:
Idaho Power Company hereby submits the attached compliance filing in the above-
captioned proceeding pursuant to Idaho Public Utilities Commission Order No. 36383, which
includes modifications to its Schedule 26 (Idaho Power Company Electric Service Rate for
Micron Technology, Inc.), Schedule 33 (Idaho Power Company Electric Service Rate for
Brisbie, LLC.), and Schedule 62 (Clean Energy Your Way Program).
The following tariff sheets contain are submitted for Commission approval:
First Revised Sheet No. 26-1 Cancelling Original Sheet No. 26-1
Second Revised Sheet No. 26-2 Cancelling First Revised Sheet No. 26-2
First Revised Sheet No. 33-1 Cancelling Original Sheet No. 33-1
First Revised Sheet No. 33-3 Cancelling Original Sheet No. 33-3
Second Revised Sheet No. 33-4 Cancelling First Revised Sheet No. 33-4
First Revised Sheet No. 62-5 Cancelling Original Sheet No. 62-5
If you have any questions regarding this filing, please contact me at (208) 388-5994 or
caschenbrenner(a)_idahopower.com.
Very truly yours,
Connie Aschenbrenner
CA:sg
Attachments
P.O.Box 70(83707)
1221 W.Idaho St.
Boise,ID 83702
Idaho Power Company First Revised Sheet No. 26-1 IDAHO PUBLIC UTILITIES COMMISSION
Cancels Approved Effective
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 26-1 Dec. 26, 2024 Nov. 8, 2024
Per ON 36429 & 36383
SCHEDULE 26 Monica Barrios-Sanchez Secretary
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED MARCH 9, 2022, AMENDED APRIL 11, 2024
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees). Terms used below have the meanings given to them in the
Special Contract referenced above.
Monthly Contract Demand Charge
$3.11 per kW of Contract Demand.
Monthly Billing Demand Charge
$16.60 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
Daily Excess Demand Charge
$1.244 per each kW over the Contract Demand.
Monthly Energy Charge
3.03940 per kWh.
Embedded Energy Fixed Cost Charge
0.00000 per kWh of Renewable Resource On-Site Usage
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos.1, 2, 3, and Second Revised Exhibit 1 of Micron's Special Contract, dated March
9, 2022, as amended.
Renewable Resource Cost
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Excess Generation Credit
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Administrative Charge
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Pricing elements that rely on the most recently filed IRP are effective December 1, 2024,
pursuant to Order No. 36383 issued on November 8, 2024.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Second Revised Sheet No. 26-2 IDAHO PUBLIC UTILITIES COMMISSION
Cancels Approved Effective
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. 26-2 Dec. 26, 2024 Nov. 8, 2024
Per ON 36429 & 36383
Monica Barrios-Sanchez Secretary
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED MARCH 9, 2022, AMENDED APRIL 11, 2024
(Continued)
RENEWABLE RESOURCE AGREEMENTS
Calculation of the Monthly Unadjusted Renewable Capacity Credit for each Project is quantified in the tables
below. The Monthly Adjusted Renewable Capacity Credit will be provided to Micron monthly, starting the
month of the Project's Renewable Capacity Credit Eligibility Date (as defined in Table 3) or the month
following the respective Project's commercial operation date, whichever is later, and will remain in effect for
the duration of the term of the Renewable Resource PPA or the period of time during which the Idaho
Power-owned Renewable Resource will provide Project Output to Micron, as applicable. The Monthly
Adjusted Renewable Capacity Credit will be provided in accordance with Second Revised Exhibit 1 of
Micron's Special Contract, dated March 9, 2022, as amended.
TABLE 1: RENEWABLE CAPACITY CREDIT
a b c d e f h
Project Most Recently Project Capacity Renewable Renewable RCC Annual RCC Micron Micron's
Acknowledged Nameplate Contribution Capacity Capacity Adjustment (c*d*e) Project Annual RCC"
IRP (kW AC) Factor Contribution Credit Rate Output (c*d*e*g)
(a*b) (RCC) Share
$/kW- r
lack 2019 40,000 0.3642 14,568 $121.19 1.0 $1,765,495.91 0.75 $1,324,121.94
esa
Energy
LC
*Table 2 denotes the Monthly Unadjusted Renewable Capacity Credit.
'Table 3 denotes each project's date of eligibility for the Annual Renewable Capacity Credit.
TABLE 2: MONTHLY UNADJUSTED RENEWABLE CAPACITY CREDIT BY MONTH
Jan Feb June July Aug Sept Oct Nov Dec
Black $69,517 $69,517 $231,721 $463,442 $231,721 $59,585 $59,585 $69,517 $69,517
Mesa
Energy
LLC'
TABLE 3: ELIGIBILITY DATE FOR RENEWABLE CAPACITY CREDIT
Project PPA Execution Date Capacity Deficiency Year Renewable Capacity Credit Eligibility Date
Black Mesa 2/16/2022 2026 7/1/2026
Energy LLC
Amounts to be adjusted by the Performance Ratio Adjustment Factor,which is calculated pursuant to the methodology
detailed in Case No. IPC-E-22-06,Attachment 1 to Idaho Power Company's Compliance Filing dated December 23, 2022, as
approved in Order No. 35735(Apr. 12, 2023), to determine the Monthly Adjusted Renewable Capacity Credit.Amounts shown
are for Micron's assigned Project Output of 30 MW and will be adjusted for each month that Micron's assigned Project Output
is greater than 30 MW.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company First Revised Sheet No. 33-1 IDAHO PUBLIC UTILITIES COMMISSION
Cancels Approved Effective
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 33-1 Dec. 26, 2024 Nov. 8, 2024
Per ON 36429 & 36383
SCHEDULE 33 Monica Barrios-Sanchez Secretary
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
SPECIAL CONTRACT DATED DECEMBER 22, 2021, AMENDED MARCH 14, 2024
POWER FACTOR ADJUSTMENT
Where the Customer's Power Factor is less than 95 percent, as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing Demand
by multiplying the measured kW by 95 percent and dividing by the actual Power Factor.
BLOCK 1
BASIC LOAD CAPACITY
The Basic Load Capacity is the average of the two greatest monthly Billing Demands established
during the 12-month period which includes and ends with the current Billing Period, but not less than
1,000 kW for Large Power Service.
BILLING DEMAND
The Billing Demand is the average kW supplied during the 15-consecutive-minute period of
maximum use during the Billing Period, adjusted for Power Factor.
ON-PEAK BILLING DEMAND
The On-Peak Billing Demand is the average kW supplied during the 15-minute period of maximum
use during the Billing Period for the On-Peak time period.
TIME PERIODS
The time periods are defined as follows. All times are stated in Mountain Time.
Summer Season
On-Peak: 7:00 p.m. to 11:00 p.m. Monday through Saturday, except holidays
Mid-Peak: 3:00 p.m. to 7:00 p.m. and 11:00 p.m. to 12:00 a.m. Monday through
Saturday, except holidays
Off-Peak: 12:00 a.m. to 3:00 p.m. Monday through Saturday and all hours on Sunday
and holidays
Non-summer Season
On Peak 6:00 a.m. to 9:00 a.m. and 5:00 p.m. to 8:00 p.m. Monday through
Saturday, except holidays
Mid-Peak: 9:00 a.m. to 12:00 p.m., 4:00 p.m. to 5:00 p.m., and 8:00 p.m. to 10:00 p.m.
Monday through Saturday, except holidays
Off-Peak: 12:00 a.m. to 6:00 a.m., 12:00 p.m. to 4:00 p.m., and 10:00 p.m. to 12:00
a.m. Monday through Saturday and all hours on Sunday and holidays
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company First Revised Sheet No. 33-3 IDAHO PUBLIC UTILITIES COMMISSION
Cancels Approved Effective
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 33-3 Dec. 26, 2024 Nov. 8, 2024
Per ON 36429 & 36383
Monica Barrios-Sanchez Secretary
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
(Continued)
BLOCK 2
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set forth in
Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees).
Terms used below have the meanings given to them in the Special Contract referenced above.
Daily Excess Demand Charge
$1.244 per each kW over the Contract Demand.
Excess Generation Credit
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021
as amended.
Monthly Contract Demand Charge
$3.11 per kW of Contract Demand.
Monthly Billing Demand Charge
$21.01 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 20,000 kilowatts.
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos. 1, 2, 3, and Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, dated
December 22, 2021, as amended.
Renewable Resource Cost
As included in the Monthly Contract Payment listed in Second Revised Exhibit 3.1 of Brisbie,
LLC's Special Contract, December 22, 2021, as amended.
Supplemental Energy Cost
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Administrative Charge
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Pricing elements that rely on the most recently filed IRP are effective December 1, 2024, pursuant
to Order No. 36383 issued on November 8, 2024.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Second Revised Sheet No. 33-4 IDAHO PUBLIC UTILITIES COMMISSION
Cancels Approved Effective
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. 33-4 Dec. 26, 2024 Nov. 8, 2024
Per ON 36429 & 36383
Monica Barrios-Sanchez Secretary
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
(Continued)
Renewable Resource Agreements
Calculation of the Monthly Unadjusted Renewable Capacity Credit for each Project is quantified in the
tables below. The Monthly Adjusted Renewable Capacity Credit will be provided to Brisbie, LLC
monthly, starting the month of the Project's Renewable Capacity Credit Eligibility Date (as defined in
Table 3) or the month following the respective Project's commercial operation date, whichever is later,
and will remain in effect for the duration of the term of the Renewable Resource PPA or the period of
time during which the Idaho Power-owned Renewable Resource will provide Project Output to Brisbie,
LLC as applicable. The Monthly Adjusted Renewable Capacity Credit will be provided in accordance
with Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, dated December 22, 2021, as
amended.
TABLE 1: RENEWABLE CAPACITY CREDIT
a b c d e f
Project Most Recently Project Capacity Renewable Renewable Renewable Annual
Acknowledged Nameplate Contribution Capacity Capacity Capacity Renewable
IRP (kW AC) Factor Contribution Credit Rate Credit Capacity
(a * b) ($/kW-yr) Adjustment Credit`
c*d*e
Pleasant 2019 200,000 0.3121 62,420 $121.19 1.0 $7,564,680
Valley
Solar
LLC
Pleasant 2021 125,000 0.3154 39,425 $131.60 1.0 $5,188,330
Valley
Solar 2
LLC
*Table 2 denotes the Monthly Unadjusted Renewable Capacity Credit.
'Table 3 denotes each project's date of eligibility for the Annual Renewable Capacity Credit.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company First Revised Sheet No. 62-5 IDAHO PUBLIC UTILITIES COMMISSION
Cancels Approved Effective
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 62-5 Dec. 26, 2024 Nov. 8, 2024
Per ON 36429 & 36383
SCHEDULE 62 Monica Barrios-Sanchez Secretary
CLEAN ENERGY YOUR WAY PROGRAM
(OPTIONAL)
(Continued)
SECTION 2: CLEAN ENERGY YOUR WAY— CONSTRUCTION (Continued)
TERMS AND CONDITIONS
Idaho Power shall have the right to select and reject Program participants at its sole discretion
based on criteria Idaho Power considers necessary to ensure the effective operation of the Program.
The terms and term length of the Renewable Construction Agreement will be determined in a
negotiation between Idaho Power and the Customer(s). The Renewable Construction Agreement will be
subject to Commission approval.
The REF generation cannot be used to offset a Customer(s)' Basic Load Capacity, Billing Demand
or On-Peak Billing Demand.
The Renewable Construction Agreement must include a Customer(s)financial guarantee to cover
stranded REF costs in the event of Customer default, dissolution, and/or relocation. The guarantee
amount will be negotiated between the Customer(s) and Idaho Power based on the value of the REF to
ensure stranded costs are not shifted to non-participants.
Renewable Construction Agreement pricing elements that rely on the most recently filed IRP are
effective December 1, 2024, pursuant to Order No. 36383, issued on November 8, 2024.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company 9rigiRal First Revised Sheet No. 26-1
Cancels
I.P.U.C. No. 30, Tariff No. 101S;xteeRth Reyiso.dOriginal Sheet No. 26-1
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED MARCH 9, 2022, AMENDED MAY 31, 2423APRIL 11, 2024
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees). Terms used below have the meanings given to them in the
Special Contract referenced above.
Monthly Contract Demand Charge
$3.11 per kW of Contract Demand.
Monthly Billing Demand Charge
$16.60 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
Daily Excess Demand Charge
$1.244 per each kW over the Contract Demand.
Monthly Energy Charge
3.03940 per kWh.
Embedded Energy Fixed Cost Charge
0.00000 per kWh of Renewable Resource On-Site Usage
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos.1, 2, 3, and Second Revised Exhibit 1 of Micron's Special Contract, dated March
9, 2022, as amended.
Renewable Resource Cost
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022,
as amended.
Excess Generation Credit
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022,
as amended.
Administrative Charge
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022,
as amended.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3604236383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective— jaRuary 1, 2024November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company 9rigiRal First Revised Sheet No. 26-1
Cancels
I.P.U.C. No. 30, Tariff No. 101 S;xteeRth RevisedOriginal Sheet No. 26-1
Pricing elements that rely on the most recently filed IRP are effective December 1, 2024,
pursuant to Order No. 36383 issued on November 8, 2024.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3604236383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—jaRuary 1, 2g24November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Forst Second Revised Sheet No. 26-2
Cancels
I.P.U.C. No. 30, Tariff No. 101 04cliga4-First Revised Sheet No. 26-2
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED MARCH 9, 2022, AMENDED MAY 31, 202-3APRIL 11, 2024
(Continued)
RENEWABLE RESOURCE AGREEMENTS
Calculation of the Monthly Unadjusted Renewable Capacity Credit for each Project is quantified in the tables
below. The Monthly Adjusted Renewable Capacity Credit will be provided to Micron monthly, starting the
month of the Project's Renewable Capacity Credit Eligibility Date (as defined in Table 3) or the month
following the respective Project's commercial operation date, whichever is later, and will remain in effect for
the duration of the term of the Renewable Resource PPA or the period of time during which the Idaho
Power-owned Renewable Resource will provide Project Output to Micron, as applicable. The Monthly
Adjusted Renewable Capacity Credit will be provided in accordance with Second Revised Exhibit 1 of
Micron's Special Contract, dated March 9, 2022, as amended.
TABLE 1: RENEWABLE CAPACITY CREDIT
a b c d e f h
Project Most Recently Project Capacity Renewable Renewable RCC Annual RCC Micron Micron's
Acknowledged Nameplate Contribution Capacity Capacity Adjustment (c*d*e) Project Annual RCC"
IRP (kW AC) Factor Contribution Credit Rate Output (c*d*e*g)
(a*b) (RCC) Share
$/kW- r
lack 2019 40,000 0.3642 14,568 $121.19 1.0 $1,765,495.91 0.75 $1,324,121.94
esa
Energy
LC
*Table 2 denotes the Monthly Unadjusted Renewable Capacity Credit.
'Table 3 denotes each project's date of eligibility for the Annual Renewable Capacity Credit.
TABLE 2: MONTHLY UNADJUSTED RENEWABLE CAPACITY CREDIT BY MONTH
Jan Feb June July Aug Sept Oct Nov Dec
Black $69,517 $69,517 $231,721 $463,442 $231,721 $59,585 $59,585 $69,517 $69,517
Mesa
Energy
LLCM
TABLE 3: ELIGIBILITY DATE FOR RENEWABLE CAPACITY CREDIT
Project PPA Execution Date Capacity Deficiency Year Renewable Capacity Credit Eligibility Date
Black Mesa 2/16/2022 2026 7/1/2026
Energy LLC
Amounts to be adjusted by the Performance Ratio Adjustment Factor,which is calculated pursuant to the methodology
detailed in Case No. IPC-E-22-06,Attachment 1 to Idaho Power Company's Compliance Filing dated December 23, 2022, as
approved in Order No. 35735(Apr. 12, 2023), to determine the Monthly Adjusted Renewable Capacity Credit.Amounts shown
are for Micron's assigned Project Output of 30 MW and will be adjusted for each month that Micron's assigned Project Output
is greater than 30 MW.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 8630236383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective— September 1, 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company oral First Revised Sheet No. 33-1
Cancels
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 33-1
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
SPECIAL CONTRACT DATED DECEMBER 22, 2021, AMENDED AUGUST 3, 2023MARCH 14, 2024
POWER FACTOR ADJUSTMENT
Where the Customer's Power Factor is less than 95 percent, as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing Demand
by multiplying the measured kW by 95 percent and dividing by the actual Power Factor.
BLOCK 1
BASIC LOAD CAPACITY
The Basic Load Capacity is the average of the two greatest monthly Billing Demands established
during the 12-month period which includes and ends with the current Billing Period, but not less than
1,000 kW for Large Power Service.
BILLING DEMAND
The Billing Demand is the average kW supplied during the 15-consecutive-minute period of
maximum use during the Billing Period, adjusted for Power Factor.
ON-PEAK BILLING DEMAND
The On-Peak Billing Demand is the average kW supplied during the 15-minute period of maximum
use during the Billing Period for the On-Peak time period.
TIME PERIODS
The time periods are defined as follows. All times are stated in Mountain Time.
Summer Season
On-Peak: 7:00 p.m. to 11:00 p.m. Monday through Saturday, except holidays
Mid-Peak: 3:00 p.m. to 7:00 p.m. and 11:00 p.m. to 12:00 a.m. Monday through
Saturday, except holidays
Off-Peak: 12:00 a.m. to 3:00 p.m. Monday through Saturday and all hours on Sunday
and holidays
Non-summer Season
On Peak 6:00 a.m. to 9:00 a.m. and 5:00 p.m. to 8:00 p.m. Monday through
Saturday, except holidays
Mid-Peak: 9:00 a.m. to 12:00 p.m., 4:00 p.m. to 5:00 p.m., and 8:00 p.m. to 10:00 p.m.
Monday through Saturday, except holidays
Off-Peak: 12:00 a.m. to 6:00 a.m., 12:00 p.m. to 4:00 p.m., and 10:00 p.m. to 12:00
a.m. Monday through Saturday and all hours on Sunday and holidays
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3604236383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—iaauaFy4November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company 9ral First Revised Sheet No. 33-3
Cancels
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 33-3
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
(Continued)
BLOCK 2
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set forth in
Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees).
Terms used below have the meanings given to them in the Special Contract referenced above.
Daily Excess Demand Charge
$1.244 per each kW over the Contract Demand.
Excess Generation Credit
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021
as amended.
Monthly Contract Demand Charge
$3.11 per kW of Contract Demand.
Monthly Billing Demand Charge
$21.01 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 20,000 kilowatts.
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos. 1, 2, 3, and Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, dated
December 22, 2021, as amended.
Renewable Resource Cost
As included in the Monthly Contract Payment listed in Second Revised Exhibit 3.1 of Brisbie,
LLC's Special Contract, December 22, 2021, as amended.
Supplemental Energy Cost
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Administrative Charge
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Pricing elements that rely on the most recently filed IRP are effective December 1, 2024, pursuant
to Order No. 36383 issued on November 8, 2024.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3694236383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—jaRuary-4November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Forst Second Revised Sheet No. 33-4
Cancels
I.P.U.C. No. 30, Tariff No. 101 First RevisedCWiqma4 Sheet No. 33-4
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
(Continued)
Renewable Resource Agreements
Calculation of the Monthly Unadjusted Renewable Capacity Credit for each Project is quantified in the
tables below. The Monthly Adjusted Renewable Capacity Credit will be provided to Brisbie, LLC
monthly, starting the month of the Project's Renewable Capacity Credit Eligibility Date (as defined in
Table 3) or the month following the respective Project's commercial operation date, whichever is later,
and will remain in effect for the duration of the term of the Renewable Resource PPA or the period of
time during which the Idaho Power-owned Renewable Resource will provide Project Output to Brisbie,
LLC as applicable. The Monthly Adjusted Renewable Capacity Credit will be provided in accordance
with Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, dated December 22, 2021, as
amended.
TABLE 1: RENEWABLE CAPACITY CREDIT
a b c d e f
Project Most Recently Project Capacity Renewable Renewable Renewable Annual
Acknowledged Nameplate Contribution Capacity Capacity Capacity Renewable
IRP (kW AC) Factor Contribution Credit Rate Credit Capacity
(a * b) ($/kW-yr) Adjustment Credit*'
c*d*e
Pleasant 2019 200,000 0.3121 62,420 $121.19 1.0 $7,564,680
Valley
Solar
LLC
Pleasant 2021 125,000 0.3154 39,425 $131.60 1.0 $5,188,330
Valley
Solar 2
LLC
*Table 2 denotes the Monthly Unadjusted Renewable Capacity Credit.
'Table 3 denotes each project's date of eligibility for the Annual Renewable Capacity Credit.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3627036383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective— j,,November 8, 2024 1221 West Idaho Street, Boise, Idaho
Idaho Power Company oral First Revised Sheet No. 62-5
Cancels
I.P.U.C. No. 30, Tariff No. 101 Original Sheet No. 62-5
SCHEDULE 62
CLEAN ENERGY YOUR WAY PROGRAM
(OPTIONAL)
(Continued)
SECTION 2: CLEAN ENERGY YOUR WAY— CONSTRUCTION (Continued)
TERMS AND CONDITIONS
Idaho Power shall have the right to select and reject Program participants at its sole discretion
based on criteria Idaho Power considers necessary to ensure the effective operation of the Program.
The terms and term length of the Renewable Construction Agreement will be determined in a
negotiation between Idaho Power and the Customer(s). The Renewable Construction Agreement will be
subject to Commission approval.
The REF generation cannot be used to offset a Customer(s)' Basic Load Capacity, Billing Demand
or On-Peak Billing Demand.
The Renewable Construction Agreement must include a Customer(s)financial guarantee to cover
stranded REF costs in the event of Customer default, dissolution, and/or relocation. The guarantee
amount will be negotiated between the Customer(s) and Idaho Power based on the value of the REF to
ensure stranded costs are not shifted to non-participants.
Renewable Construction Agreement pricing elements that rely on the most recently filed IRP are
effective December 1, 2024, pursuant to Order No. 36383, issued on November 8, 2024.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No.- 3604236383 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective ---JaRuary , 2024November 8, 2024 1221 West Idaho Street, Boise, Idaho