HomeMy WebLinkAbout20241220TARIFF ADVICE NO. IPC-TAE-24-05.pdf -0IQAHO POWER.
RECEIVED
CONNIE ASCHENBRENNER 2024 December 20 PM 2:33
Rate Design Senior Manager IDAHO PUBLIC
caschenbrenner(cD_idahopower.com UTILITIES COMMISSION
TariffAdv xM. W TAE24-O5
December 20, 2024
VIA ELECTRONIC FILING
Commission Secretary
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg 8,
Suite 201-A (83714)
PO Box 83720
Boise, Idaho 83720-0074
Re: Tariff Advice No. 24-05
Annual Compliance Filing to Update Charges, Credits, and General Overheads
under Rule H, New Service Attachments and Distribution Line Installations or
Alterations
Dear Commission Secretary:
Pursuant to Commission Rule of Procedure' 134 (IDAPA 31.01.01.134.01), Idaho
Power Company ("Idaho Power" or "Company") hereby submits proposed cost updates
to the charges, credits, and general overhead rate outlined in Rule H, New Service
Attachments and Distribution Line Installations or Alterations ("Rule H"). This is the annual
compliance filing to update Rule H charges and credits as required by Idaho Public
Utilities Commission ("Commission") Order Nos. 30853 and 30955. The Company also
requests to update its general overhead rate pursuant to Order No. 32472. The following
tariff sheets identify the proposed cost updates, allowances, and change to the general
overhead rate:
Second Revised Sheet No. H-4 Cancelling First Revised Sheet No. H-4
Second Revised Sheet No. H-7 Cancelling First Revised Sheet No. H-7
Second Revised Sheet No. H-8 Cancelling First Revised Sheet No. H-8
Second Revised Sheet No. H-9 Cancelling First Revised Sheet No. H-9
Second Revised Sheet No. H-10 Cancelling First Revised Sheet No. H-10
Second Revised Sheet No. H-11 Cancelling First Revised Sheet No. H-11
' Hereinafter cited as RP.
P.O.Box 70(83707)
1221 W.Idaho St.
Boise,ID 83702
Commission Secretary
December 20, 2024
Page 2
The cost estimation methodology used to update the charges and credits in this
tariff advice is the same methodology the Company utilized in previous annual filings. All
proposed cost updates are summarized in the attachments to this advice filing; the
charges are presented comparatively to the prior year's filing and are also broken out by
the cost of Company vehicles/equipment, labor, materials, and trench, where applicable.
Overall, the proposed Rule H charges generally increased primarily due to
increases in labor costs, in addition to increased costs for certain materials. However,
the decrease in the overhead rate from 10.69 percent to 9.42 percent helped offset a
portion of these increased costs. Single phase and three phase allowances, provided to
customers as an offset to their upfront cost responsibility, both increased by 11 percent.
More details on the inputs driving the proposed cost updates are provided below:
Labor Costs
The construction labor rate (the labor rate used to develop the charges and
credits) increased from $88 to $91. Additionally, the Engineering Charge increased by
approximately 4 percent, which results in the proposed Engineering Charge increasing
from $93 to $97 per hour.
Material Costs
The cost of materials included within the Underground Service Attachment
Distance Charge for Company Installed 1/0, 4/0, and 350 underground cable decreased
by 7 percent, 5 percent, and 7 percent, respectively. The cost of materials included in
that same category of charges for Customer Provided Trench and Conduit saw an 8
percent reduction for 1/0 conductor, 3 percent reduction for 4/0 conductor, and a 7
percent reduction for 350 conductor.
The Company's stores loading rate, which captures the cost of supervision, labor
and expenses incurred for the purchasing, storage, handling and distribution of materials
and supplies, decreased from 6.5 percent to 4.75 percent.
Trench Costs
Trench costs are included in the Underground Service Attachment Distance
Charge for Company Installed 1/0, 4/0 and 350 underground cable. As accepted by the
Commission on February 26, 2019, under Tariff Advice No. 18-03, the Company utilizes
a blended rate methodology to calculate the average per foot cost of trench work
performed by the Company and third-party contractors. While the trenching cost
component of the Underground Service Attachment Distance Charge for Company
Installed 1/0, 4/0 and 350 underground cable has increased as a result of increased third-
party contractor rates, it is important to note that less than one percent of customers
Commission Secretary
December 20, 2024
Page 3
chose to have the Company install trench and conduit for underground service
attachments in 2024.
Vehicle Costs
A line truck and bucket truck are the primary vehicles utilized to perform Rule H
type work and the hourly rate for both vehicles increased by 1 percent, or from $54.51 to
$55.14. Because vehicle costs make up approximately 10 percent, on average, of the
total costs associated with the proposed Rule H charges and credits, the increased
vehicle rate results in a slight increase to each of the proposed Rule H charges and
credits.
Single Phase and Three Phase Allowances
Allowances are provided as a credit to offset a portion of the upfront cost of
terminal facilities paid for by customers pursuant to Rule H. The proposed updates to the
Company-funded allowance amounts increased for both the single phase and three
phase allowances, primarily due to the increased cost of transformers, which was
partially offset by the decrease in overheads, certain materials, and the stores loading
rate, as noted above. The Company proposes to update the single phase allowance from
$3,813 to $4,233, and the three phase allowance from $7,863 to $8,707.
Idaho Power respectfully requests that the proposed updates are approved by
March 1, 2025, and become effective March 15, 2025. This 14-day implementation
period is necessary to update computer systems, prepare new communication materials,
and train personnel.
If you have any questions regarding this tariff advice, please contact Regulatory
Analyst Ashley Herrera at 208-388-2656 or aherrera@idahopower.com.
Sincerely,
Connie Aschenbrenner
CA:sg
Enclosures
Idaho Summary of Changes
Existing Proposed Difference
2024 2025 $ %
Underground Service Attachment Charges
(Rule H Section 4.b.i)
Base Charge
Underground $ 27.00 $ 28.00 $ 1.00 4%
2" riser $ 991.00 $ 991.00 $ - 0%
3" riser $ 1,207.00 $ 1,247.00 $ 40.00 3%
Distance Charge (per foot)
Company Installed
1/0 $ 13.52 $ 14.97 $ 1.45 11%
4/0 $ 14.52 $ 15.98 $ 1.46 10%
350 $ 19.31 $ 20.30 $ 0.99 5%
Customer Provided Trench & Conduit
1/0 $ 3.89 $ 4.11 $ 0.22 6%
4/0 $ 4.89 $ 5.12 $ 0.23 5%
350 $ 7.12 $ 7.13 $ 0.01 0%
Other Charges
(Rule H Section 6)
Engineering Charge $ 93.00 $ 97.00 $ 4.00 4%
Temporary Service Attachment Charge
Underground $ 74.00 $ 76.00 $ 2.00 3%
Overhead $ 359.00 $ 330.00 $ (29.00) (8%)
Temporary Service (Overhead or Underground)
and Overhead Permanent Return Trip Charge $ 74.00 $ 76.00 $ 2.00 3%
Underground Service Return Trip Charge $ 123.00 $ 126.00 $ 3.00 2%
Line Installation and Service Attachment Allowances
(Rule H Section 7.a)
Residential
Schedules 1, 3, 5, 6 $ 3,813.00 $ 4,233.00 $ 420.00 11%
Non-residential
Schedules 7, 8, 9, 24
Single Phase $ 3,813.00 $ 4,233.00 $ 420.00 11%
Three Phase $ 7,863.00 $ 8,707.00 $ 844.00 11%
General Overheads 10.69% 9.42%
Summary of Changes Page 1 of 1
Idaho
Rule H: New Service Attachments and Distribution
Line Installations or Alterations
2025 Update to Charges and Credits
All costs were calculated using the Company's Asset Suite inventory and cost program. The same design
number was used for consistency and accuracy. A summary of all costs is shown below.
Design 174446
Design 0000174446 Design Search Status PLAN 12/022024
Facility EDS
Description RULE H FILING 2025-IDAHO
Client ID Account
Location WID BKATIIA BKAT-011 BLACKCAT-011 ADA COUNTY
Designer STP0802 Design Type 45
Required In Service Service Type
Service Request Request Type
Billing Rate External Design Required
Billing Template 5T - RULEHPUC Capital Project
Rate Category Project
Planning Center Email
Version Description Estimated Cost
1 BASE CHARGE UG SERVICE 2025 $27.82
2 2" POLE RISER 2025 $990.51
3 3" POLE RISER 2025 $1,246.91
4 IPCO TRENCH 1/0 SERVICE 2025 $1,776.56
5 IPCO TRENCH 4/0 SERVICE 2025 $1,878.21
6 IPCO TRENCH 350 SERVICE 2025 $2,309.65
7 CUSTOMER TRENCH 1/0 SERVICE 2025 $690.66
8 CUSTOMER TRENCH 4/0 SERVICE 2025 $792.31
9 CUSTOMER TRENCH 350 SERVICE 2025 $992.44
10 TEMP UNDERGROUND 2025 $75.74
11 TEMP OVERHEAD 2025 $329.64
12 RETURN TRIP TEMP OH/UG&PERM OH SERV&TRENCH 2O25 $75.74
13 UNDERGROUND RETURN TRIP 2025 $125.52
14 SINGLE PHASE ALLOWANCE 2025 $4,232.61
15 THREE PHASE ALLOWANCE 2025 $8,707.41
Rule H 2O25 Update to Charges and Credits Page 1 of 16
Rule H: Section 4.b.i.
Service Attachment Charges
Underground Service Attachment Charge — Base Charge
From Underground:
Company Vehicles - $ 6.04
Labor Cost - 19.91
Material Cost - Cable tag & tie 1.87
Total $ 27.82
Proposed Update - $ 28.00
Design Version 0000174446 001 Status PLAN 12/022024
Description BASE CHARGE UG SERVICE 2025
Designer STP0802 Service Type -
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000174446001
Estimated Cost $ 7.82 Transfer to Work Order
Quote Navigate to Work Order �7
Quote Date Retain Material Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size _ _I Work Hours 5-00
Trip Time Resource PERS TR:AVELCE
Rule H 2O25 Update to Charges and Credits Page 2 of 16
Underground Service Attachment Charge — Base Charge
From Overhead 2" Riser:
Company Vehicles - $ 81.48
Labor Cost - 261.87
2" PVC conduit, 2" fiberglass conduit
35 feet of 1/0 triplex cable for service
nuts, bolts, brackets and washers
Material Cost - 647.16
Total $ 990.51
Proposed Update - $ 991.00
Design Version 0000174446 002 status PLAN 1210212024
Description 2'POLE RISER 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage Vo
Rate Category Extemal Cross Reference 0000174446002
Estimated Cost S 990 51 Transfer to Work Order
Quote Navigate to Work Order ./
Quote Date Retain Material Request iJ
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size ' Work Hours 8.00
Trip Time Resource PERS TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 3 of 16
Underground Service Attachment Charge — Base Charge
From Overhead 3" Riser
Company Vehicles - $ 96.92
Labor Cost - 312.65
3" PVC conduit, 3" fiberglass conduit
35 feet of 4/0 triplex cable for service
nuts, bolts, brackets and washers
Material Cost - 837.34
Total $ 1,246.91
Proposed Update - $ 1,247.00
Design Version OD00174446 003 status PLAN 1 210 22 0 2 4
Description 3-POLE RISER 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC salvage yj
Rate Category External Cross Reference 0000174446003
Estimated Cost $1,246.91 Transfer to Work Order
Quote Navigate to Work Order J
Quote Date Retain Material Request —
CU Category Cost Class IP O
Design Task Type Crew Type
Crew Size _ Work Hours 8,00
Trip Time Resource PERS - TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 4 of 16
Underground Service Attachment Charge — Distance Charge
Company Installed, 100 feet of 1/0 underground cable:
(5 person crew& 0.5 hours of travel time)
Company Vehicles - $ 147.82
Labor Cost - 692.02
Service trench & backf ill 30" depth (100 feet)
Service cable 1/0 (100 feet)
2" conduit (100 feet)
2" conduit 90 degree bend
Material Cost - 380.87
Trench Cost - 555.85
Sub Total $ 1,776.56
Minus the cost of a 100 foot #2 triplex overhead service $ (279.85)
Total $ 1,496.71
Proposed Update - $ 14.97 /ft
Design Version 0000174446 004 Status PLAN 12J0212O24
Description IPCO TRENCH 1/0 SERVICE 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000174446004
Estimated Cost $1,776.56 Transfer to Work Order
Quote Navigate to Work Order %/
Quote Date .___ Retain Material Request —
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 5 Work Hours '00
Trip Time 0.5 Resource PERS TRAVELCE
Overhead service credit used in all underground service attachment charges
100 Feet of#2 Triplex
Company Vehicles - $ 30.16
Labor Cost - 149.36
Minus Travel (49.79)
Material Cost - 150.12
Total $ 279.85
Rule H 2O25 Update to Charges and Credits Page 5 of 16
Underground Service Attachment Charge — Distance Charge
Company Installed, 100 feet of 4/0 underground cable:
(5 person crew& 0.5 hours of travel time)
Company Vehicles - $ 147.82
Labor Cost - 692.02
Service trench & backf ill 30" depth (100 feet)
Service cable 4/0 (100 feet)
2" conduit (100 feet)
2" conduit 90 degree bend
Material Cost - 482.52
Trench Cost - 555.85
Sub Total $ 1,878.21
Minus the cost of a 100 foot #2 triplex overhead service $ (279.85)
Total $ 1,598.36
Proposed Update - $ 15.98 /ft
Design Version 0000174446 005 Status PLAN 1 210 22 0 2 4
Description IPCO TRENCH 4/0 SERVICE 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage 0
Rate Category External Cross Reference 0000174446005
Estimated Cost $1,87821 Transfer to Work Order
Quote Navigate to Work Order J
Quote Date sr Retain Material Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 5 Work Hours E.00
Trip Time 0.5 Resource PERS TRAVELCE
------------------
Rule H 2O25 Update to Charges and Credits Page 6 of 16
Underground Service Attachment Charge — Distance Charge
Company Installed, 100 feet of 350 underground cable:
(5 person crew& 0.5 hours of travel time)
Company Vehicles - $ 162.90
Labor Cost - 741.81
Service trench & backf ill 30" depth (100 feet)
Service cable 350 (100 feet)
3" conduit (100 feet)
3" conduit 90 degree bend
Material Cost - 849.09
Trench Cost - 555.85
Sub Total $ 2,309.65
Minus the cost of a 100 foot #2 triplex overhead service $ (279.85)
Total $ 2,029.80
Proposed Update - $ 20.30 /ft
Design Version 0000174446 006 Status PLAN 12IO2r2024
Description IPCO TRENCH 350 SERVICE 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000174446006
Estimated Cost S2.30965 Transfer to Work Order
Quote Navigate to Work Order
Quote Date Retain Material Request
Cu Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 5 Work Hours 3.00
Trip Time 0.5 Resource PIERS TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 7 of 16
Underground Service Attachment Charge — Distance Charge
Customer provided trench & conduit, 100 feet of 1/0 underground cable:
(2 person crew&0.5 hours of travel time)
Company Vehicles - $ 105.58
Labor Cost - 423.18
Material Cost - Service cable 1/0 (100 feet) 161.90
Sub Total $ 690.66
Minus the cost of a 100 foot #2 triplex overhead service $ (279.85)
Total $ 410.81
Proposed Update - $ 4.11 /ft
Design Version 0000174446 007 status PLAN 1210212 0-14
Description CUSTOMER TRENCH 110 SERVICE 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000117444A007
Estimated Cost $690.66 Transfer to Work Order
Quote Navigate to Work Order 0
Quote Date Retain Material Request
CU Category Cost Class IPCO
design Task Type Crew Type
Crew Size 2 Work Hours 8.00
Trip Time 0.5 Resource PERS - TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 8 of 16
Underground Service Attachment Charge — Distance Charge
Customer provided trench & conduit, 100 feet of 4/0 underground cable:
(2 person crew&0.5 hours of travel time)
Company Vehicles - $ 105.58
Labor Cost - 423.18
Material Cost - Service cable 4/0 (100 feet) 263.55
Sub Total $ 792.31
Minus the cost of a 100 foot #2 triplex overhead service $ (279.85)
Total $ 512.46
Proposed Update - $ 5.12 /ft
Design Version 0000174446 008 status PLAN 12/022024
Description CUSTOMER TRENCH 4/0 SERVICE 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage �I
Rate Category External Cross Reference 0000174446008
Estimated Cost $792.31 Transfer to Work Order
Quote Navigate to Work Order
Quote Date m% Retain Material Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size ? Work Hours 8,00
Trip Time 0 5 Resource PERS - TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 9 of 16
Underground Service Attachment Charge — Distance Charge
Customer provided trench & conduit, 100 feet of 350 underground cable:
(2 person crew&0.5 hours of travel time)
Company Vehicles - $ 120.66
Labor Cost - 472.97
Material Cost - Service cable 350 (100 feet) 398.81
Sub Total $ 992.44
Minus the cost of a 100 foot #2 triplex overhead service $ (279.85)
Total $ 712.59
Proposed Update - $ 7.13 /ft
Design Version 0000174446 009 Status PLAN 12/022024
Description CUSTOMER TRENCH 350 SERVICE 202_5
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000174446009
Estimated Cost $992.44 Transfer to Work Order
Quote Navigate to Work Order
Quote Date Retain Material Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size _ Work Hours 800
Trip Time 0.5 Resource PERS TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 10 of 16
Rule H: Section 6
Other Charges
b. Engineering Charge
2024 Wage Schedule - Senior Distribution Designer $ 60.88 /hour
2024 Benefits (actual) 50.00% 30.44 /hour
Proposed General Overhead 9.42% 5.73 /hour
Total $ 97.05 /hour
Proposed Update - $ 97.00 /hour
g. Temporary Service Attachment Charge
i. Underground
Company Vehicles - $ 6.04
Labor Cost - 69.70
Material Cost - -
Total $ 75.74
Proposed Update - $ 76.00
Design Version 0000174446 010 Status PLAN 12I0212024
Description TEMP UNDERGROUND 2025 =
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage %/
Rate Category Extemal Cross Reference 0000174446010
Estimated Cost S 75.74 Transfer to Work Order
Quote Navigate to Work Order
Quote Date Retain Material Request
CU Category Cost Class IPCO
Design Task Type - Crew Type
Crew Size 1 Work Hours 8.00
Trip Time 0 5 Resource PERS TRAVELGE
Rule H 2O25 Update to Charges and Credits Page 11 of 16
g. Temporary Service Attachment Charge
ii. Overhead
Company Vehicles - $ 30.16
Labor Cost - 149.36
Material Cost -
100 ft#2 triplex, wedge clamps, nuts, bolts 150.12
Total $ 329.64
Proposed Update - $ 330.00
Design Version 0000174446 011 Status PLAN 1 r02i_0Z4
Description TEMP OVERHEAD 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage 0
Rate Category External Cross Reference 0000174446011
Estimated Cost 3329.64 Transfer to Work Order
Quote Navigate to Work Order d
Quote Date Retain Material Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 1 Work Hours 8.00
Trip Time 0.5 Resource PERS - TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 12 of 16
h. Temporary Service (Overhead or Underground), Overhead Permanent
and Customer Provided Trench Inspection Return Trip Charge
Company Vehicles - $ 6.04
Labor Cost - 69.70
Total $ 75.74
Proposed Update - $ 76.00
Design Version 0000174446 012 Status PLAN 12/022024
Description RETURN TRIP TEMP OHIUG&PERM OH SERV&TRENCH 2O25
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000174446012
Estimated Cost S75.74 Transfer to Work Order
Quote Navigate to Work Order
Quote Date Retain Material Request U
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 1 Work Hours 8.00
Trip Time 0 5 Resource PERS TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 13 of 16
j. Underground Service Return Trip Charge
Company Vehicles - $ 6.04
Labor Cost - 119.48
Total $ 125.52
Proposed Update - $ 126.00
Design Version 0000174446 013 Status PLAN 1210212024
Description UNDERGROUND RETURN TRIP 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 0000174446013
Estimated Cost S 125.52 Transfer to Work Order
Quote Navigate to Work Order %�j
Quote Date Retain Material Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 2 Work Hours 8.00
Trip Time 0 5 Resource PERS - TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 14 of 16
Rule H: Section 7
Line Installation and Service Attachment Allowances
Allowances are based on the cost of providing and installing Standard Terminal Facilities for single
phase and three phase services.
Single Phase Allowance:
Company Vehicles - $ 177.98
Labor Cost - 829.59
Material Cost - Wedge stirrup hot tap 53.05
Switch arm 66.13
Switch 193.86
25 kVA transformer 2,641.38
Transformer bussing 49.61
Service wire - 125 feet 175.42
Ground rod 32.23
Neutral wedge connector 8.01
$ 3,219.69
Total Materials $ 3,225.04
Total $ 4,232.61
Proposed Update - $ 4,233.00
Design Version 0000174446 014 Status PLAN 1210212024
Description SINGLE PHASE ALLOWANCE 2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage
Rate Category External Cross Reference 000011744460114
Estimated Cost S4,23261 Transfer to Work Order
Quote Navigate to Work Order 0
Quote Date Retain Material Request F
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 5 Work Hours 8.00
Trip Time 0.5 Resource PERS - TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 15 of 16
Three Phase Allowance:
Company Vehicles - $ 493.40
Labor Cost - 2,119.62
Material Cost - Wedge stirrup hot tap (3) 159.15
Switch arm 233.29
Switch (3) 506.51
Transformer mount 600.00
15 kVA transformer (3) 4,240.01
Transformer bussing 95.08
Service wire - 125 feet 207.16
Ground rod 32.23
Neutral wedge connector 8.01
$ 6,081.44
Total Materials $ 6,094.39
Total $ 8,707.41
Proposed Update - $ 8,707.00
Design Version 0000174446 015 Status PLAN
Description THREE PHASE ALLOWANCE2025
Designer STP0802 Service Type
Billing Template ST RULEHPUC Salvage se
Rate Category External Cross Reference D000174446015
Estimated Cost S 8.707 41 Transfer to Work Order
Quote Navigate to Work Order
Quote Date Retain Maternal Request
CU Category Cost Class IPCO
Design Task Type Crew Type
Crew Size 5 Work Hours 8.00
Trip Time 0 5 Resource PERS TRAVELCE
Rule H 2O25 Update to Charges and Credits Page 16 of 16
Idaho Power Company Second Revised Sheet No. H-4
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. H-4
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
1. Definitions (Continued)
Unusual Conditions are construction conditions not normally encountered, but which the
Company may encounter during construction which impose additional, project-specific costs.
These conditions may include, but are not limited to: frost, landscape replacement, road
compaction, pavement replacement, chip-sealing, rock digging/trenching, boring, nonstandard
facilities or construction practices, and other than available voltage requirements.
Costs associated with unusual conditions are separately stated and are subject to refund if not
encountered. If unusual conditions are not encountered, the Company will issue the appropriate
refund within 30 days of completion of the project's reconciliation of costs.
Upgrade is a request by a customer to increase capacity and/or size of Company-owned
distribution facilities. Upgrades are eligible for Vested Interest Refunds.
Vested Interest is the right to a refund that an Applicant or Additional Applicant holds in a specific
section of distribution facilities when Additional Applicants attach to that section of distribution
facilities.
Vested Interest Charge is an amount collected from an Additional Applicant for refund to a Vested
Interest Holder.
Vested Interest Holder is an entity that has paid a refundable Line Installation Charge to the
Company for a Line Installation. A Vested Interest Holder may also be an entity that has paid a
refundable charge to the Company under the provisions of a prior rule or schedule.
Vested Interest Refund is a refund payment to an existing Vested Interest Holder resulting from
a Vested Interest Charge to an Additional Applicant.
Vested Interest Portion is that part of the Company's distribution system in which a Vested Interest
is held.
Work Order Cost is a cost estimate performed by the Company for a specific request for service
by an Applicant or Additional Applicant. The Work Order Cost will include general overheads of
9.42 percent.
IDAHO Issued by IDAHO POWER COMPANY
Issued — December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company Second Revised Sheet No. H-7
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. H-7
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
4. Service Attachment Charqes
a. Overhead Service Attachment Charge. If an overhead Service Attachment is required, the
Applicant or Additional Applicant will pay a non-refundable Service Attachment Charge
equal to the Work Order Cost less applicable Allowances identified in Section 7.
b. Underground Service Attachment Charge. Each Applicant or Additional Applicant will pay
a non-refundable Underground Service Attachment Charge for attaching new Terminal
Facilities to the Company's distribution system. The Company will determine the location
and maximum length of service cable.
i. Single Phase 400 Amps or Less and Single Phase Self-Contained Multiple Meter
Bases 500 Amps or Less.
Underground Service Cable (Base charge plus Distance charge)
Base charge from:
underground $ 28.00
overhead including 2" riser $ 991.00
overhead including 3" riser $1,247.00
Distance charge (per foot)
Company Installed Facilities with:
1/0 underground cable $ 14.97
4/0 underground cable $ 15.98
350 underground cable $ 20.30
Customer Provided Trench & Conduit with:
1/0 underground cable $ 4.11
4/0 underground cable $ 5.12
350 underground cable $ 7.13
ii. All Three Phase, Single Phase Greater than 400 Amps, and Single Phase Self-
Contained Multiple Meter Bases Greater Than 500 Amps.
If a three phase, single phase greater than 400 amp, or single phase self-contained
multiple meter base greater than 500 amp underground Service Attachment is
required, the Applicant or Additional Applicant will pay a non-refundable
Underground Service Attachment Charge equal to the Work Order Cost.
IDAHO Issued by IDAHO POWER COMPANY
Issued — December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company Second Revised Sheet No. H-8
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. H-8
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
5. Vested Interest Charges
Additional Applicants connecting to a vested portion of a Line Installation will pay a Vested Interest
Charge to be refunded to the Vested Interest Holder. Additional applicants will have two payment
options:
Option One - An Additional Applicant may choose to pay an amount determined by this
equation:
Vested Interest Charge = A x B x C where;
A = Load Ratio: Additional Applicant's Connected Load divided by the sum of
Additional Applicant's Connected Load and Vested Interest Holder's load.
B = Distance Ratio: Additional Applicant's distance divided by original distance.
C = Vested Interest Holder's unrefunded contribution.
Option Two - An Additional Applicant may choose to pay the current Vested Interest, in
which case the Additional Applicant will become the Vested Interest Holder and, as such,
will become eligible to receive Vested Interest Refunds in accordance with Section 8.a.
If Option One is selected, the Additional Applicant has no Vested Interest and the previous Vested
Interest Holder remains the Vested Interest Holder. The Vested Interest Holder's Vested Interest
will be reduced by the newest Additional Applicant's payment.
The Vested Interest Charge will not exceed the sum of the Vested Interests in the Line Installation.
If an Additional Applicant connects to a portion of a vested Line Installation which was established
under a prior rule or schedule, the Vested Interest Charges of the previous rule or schedule apply
to the Additional Applicant.
6. Other Charges
a. Alteration Charges. If an Applicant or Additional Applicant requests a Relocation, Upgrade,
Conversion or removal of Company facilities, the Applicant or Additional Applicant will pay
a non-refundable charge equal to the Cost Quote.
b. Engineering Charge. Applicants or Additional Applicants will be required to prepay all
engineering costs for Line Installations and/or Alterations greater than 16 estimated hours.
Estimates equal to or less than 16 hours will be billed to the Applicant or Additional
Applicant as part of the construction costs, or after the engineering is completed in
instances where construction is not requested. Engineering charges will be calculated at
$97.00 per hour.
IDAHO Issued by IDAHO POWER COMPANY
Issued — December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company Second Revised Sheet No. H-9
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. H-9
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
6. Other Charges (Continued)
C. Engineering Charges for Agencies and Taxing Districts of the State of Idaho. Under the
authority of Idaho Code § 67-2302, an agency or taxing district of the State of Idaho may
invoke its right to decline to pay engineering charges until the engineering services have
been performed and billed to the agency or taxing district. Any state agency or taxing
district that claims it falls within the provisions of Idaho Code § 67-2302 must notify Idaho
Power of such claim at the time Idaho Power requests prepayment of the engineering
charges. Idaho Power may require that the state agency or taxing district's claim be in
writing. If the state agency or taxing district that has invoked the provisions of Idaho Code
§ 67-2302 does not pay the engineering charges within the 60-day period as provided in
that statute, all the provisions of that statute will apply.
d. Joint Trench Charge. Applicants, Additional Applicants, and subdividers will pay the
Company for trench and backfill costs included in the Cost Quote. In the event the
Company is able to defray any of the trench and backfill costs by sharing a trench with
other utilities, the cost reduction will be included in the Cost Quote.
e. Rights-of-Way and Easement Charge. Applicants or Additional Applicants will be
responsible for any costs associated with the acquisition of rights-of-way or easements.
f. Temporary Line Installation Charge. Applicants or Additional Applicants will pay the
installation and removal costs of providing Temporary Line Installations.
g. Temporary Service Attachment Charge. Applicants or Additional Applicants will pay for
Temporary Service Attachments as follows:
i. Underground - $76.00
The customer-provided meter post must be set within two linear feet of the
Company's existing transformer or junction box.
IDAHO Issued by IDAHO POWER COMPANY
Issued — December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company Second Revised Sheet No. H-10
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. H-10
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
6. Other Charges (Continued)
g. Temporary Service Attachment Charge (Continued)
ii. Overhead - $330.00
The customer-provided meter pole shall be set in a location that does not require
more than 100 feet of#2 aluminum service conductor that can be readily attached
to the permanent location by merely relocating it.
The electrical facilities provided by the customer on the meter pole shall be
properly grounded, electrically safe, meet all clearance requirements, and ready
for connection to Company facilities.
The customer shall obtain all permits required by the applicable state, county, or municipal
governments and will provide copies or verification to the Company as required. The above
conditions must be satisfied before the service will be attached.
h. Temporary Service (Overhead or Underground), Overhead Permanent, and Customer
Provided Trench Inspection Return Trip Charge. A Return Trip Charge of $76.00 will be
assessed each time Company personnel are dispatched to the job site, but are unable to
connect the service. The charge will be billed after the conditions have been satisfied and
the connection has been made.
i. Unusual Conditions Charge. Applicants, Additional Applicants, and subdividers will pay
the Company the additional costs associated with any Unusual Conditions included in the
Cost Quote. This payment, or portion thereof, will be refunded to the extent that the
Unusual Conditions are not encountered.
In the event that the estimate of the Unusual Conditions included in the Cost Quote is equal to or greater
than $10,000, the Applicant, Additional Applicant or subdivider may either pay for the Unusual Conditions
or, at the option of the Company, may furnish an Irrevocable Letter of Credit drawn on a local bank or
local branch office issued in the name of Idaho Power Company for the amount of the Unusual
Conditions. Upon completion of that portion of the project which included an Unusual Conditions estimate,
Idaho Power Company will bill the Applicant, Additional Applicant or subdivider for the amount of Unusual
Conditions encountered up to the amount established in the Irrevocable Letter of Credit. The Applicant,
Additional Applicant or subdivider will have 15 days from the issuance of the Unusual Conditions billing
to make payment. If the Applicant, Additional Applicant or subdivider fails to pay the Unusual Conditions
bill within 15 days, Idaho Power will request payment from the bank.
IDAHO Issued by IDAHO POWER COMPANY
Issued - December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective— March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company Second Revised Sheet No. H-11
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. H-11
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
6. Other Charges (Continued)
j. Underground Service Return Trip Charge. When a customer agrees to supply the trench,
backfill, conduit, and compaction for an underground service, an Underground Service
Return Trip Charge of$126.00 will be assessed each time the Company's installation crew
is dispatched to the job site at the customer's request, but is unable to complete the cable
installation and energize the service due to the Company's required specifications not
being met.
7. Line Installation, Shared Terminal Facilities and Service Attachment Allowances
The Company will contribute an Allowance toward the cost of Terminal Facilities associated with
an additional Line Installation and/or Service Attachment. If a Customer increases their
consumptive load and is responsible for upgrading Shared Terminal Facilities, such Customer will
receive an Allowance toward the cost of the upgraded Shared Terminal Facilities. Allowances are
based on the cost of providing and installing Standard Terminal Facilities for single phase and
three phase services.
a. Allowances for Overhead and Underground Line Installations, Shared Terminal Facilities
and Overhead Service Attachments
Class of Service Maximum Allowance per Service
Residential:
Schedules 1, 3, 5, 6 $4,233.00
Non-residence $ 0.00
Non-residential:
Schedules 7, 8, 9, 24
Single Phase $4,233.00
Three Phase $8,707.00
Large Power Service
Schedule 19 Case-By-Case
b. Allowances for Subdivisions and Multiple Occupancy Projects
Developers of Subdivisions and Multiple Occupancy Projects will receive a $4,233.00
Allowance for each single phase transformer installed within a development and a
$8,707.00 Allowance for each three phase transformer installed within a development.
Subdividers will be eligible to receive Allowances for Terminal Facilities installed inside
residential and non-residential subdivisions.
IDAHO Issued by IDAHO POWER COMPANY
Issued — December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective— March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company Forst Second Revised Sheet No. H-4
Cancels
I.P.U.C. No. 30, Tariff No. 101 Q#Qinal-First Revised Sheet No. H-4
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
1. Definitions (Continued)
Unusual Conditions are construction conditions not normally encountered, but which the
Company may encounter during construction which impose additional, project-specific costs.
These conditions may include, but are not limited to: frost, landscape replacement, road
compaction, pavement replacement, chip-sealing, rock digging/trenching, boring, nonstandard
facilities or construction practices, and other than available voltage requirements.
Costs associated with unusual conditions are separately stated and are subject to refund if not
encountered. If unusual conditions are not encountered, the Company will issue the appropriate
refund within 30 days of completion of the project's reconciliation of costs.
Upgrade is a request by a customer to increase capacity and/or size of Company-owned
distribution facilities. Upgrades are eligible for Vested Interest Refunds.
Vested Interest is the right to a refund that an Applicant or Additional Applicant holds in a specific
section of distribution facilities when Additional Applicants attach to that section of distribution
facilities.
Vested Interest Charge is an amount collected from an Additional Applicant for refund to a Vested
Interest Holder.
Vested Interest Holder is an entity that has paid a refundable Line Installation Charge to the
Company for a Line Installation. A Vested Interest Holder may also be an entity that has paid a
refundable charge to the Company under the provisions of a prior rule or schedule.
Vested Interest Refund is a refund payment to an existing Vested Interest Holder resulting from
a Vested Interest Charge to an Additional Applicant.
Vested Interest Portion is that part of the Company's distribution system in which a Vested Interest
is held.
Work Order Cost is a cost estimate performed by the Company for a specific request for service
by an Applicant or Additional Applicant. The Work Order Cost will include general overheads of
19.699.42 percent.
IDAHO Issued by IDAHO POWER COMPANY
Issued-—-
DeGe bee 26 2023December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—_ MaFGh 15, 2024 March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 23-0224-05
Idaho Power Company Forst Second Revised Sheet No. H-7
Cancels
I.P.U.C. No. 30, Tariff No. 101 gal-First Revised Sheet No. H-7
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
4. Service Attachment Charqes
a. Overhead Service Attachment Charge. If an overhead Service Attachment is required, the
Applicant or Additional Applicant will pay a non-refundable Service Attachment Charge
equal to the Work Order Cost less applicable Allowances identified in Section 7.
b. Underground Service Attachment Charge. Each Applicant or Additional Applicant will pay
a non-refundable Underground Service Attachment Charge for attaching new Terminal
Facilities to the Company's distribution system. The Company will determine the location
and maximum length of service cable.
i. Single Phase 400 Amps or Less and Single Phase Self-Contained Multiple Meter
Bases 500 Amps or Less.
Underground Service Cable (Base charge plus Distance charge)
Base charge from:
underground $ 27.0028.00
overhead including 2" riser $ 991.00
overhead including 3" riser $1,, 001,247.00
Distance charge (per foot)
Company Installed Facilities with:
1/0 underground cable $ 43.5214.97
4/0 underground cable $ 14.5215.98
350 underground cable $ 49.3120.30
Customer Provided Trench & Conduit with:
1/0 underground cable $ 3�94.11
4/0 underground cable $ 4.995.12
350 underground cable $ 7-.427.13
ii. All Three Phase, Single Phase Greater than 400 Amps, and Single Phase Self-
Contained Multiple Meter Bases Greater Than 500 Amps.
If a three phase, single phase greater than 400 amp, or single phase self-contained
multiple meter base greater than 500 amp underground Service Attachment is
required, the Applicant or Additional Applicant will pay a non-refundable
Underground Service Attachment Charge equal to the Work Order Cost.
IDAHO Issued by IDAHO POWER COMPANY
Issued —_ DeGeRgbeF 26 202, December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—_ MaFGh 15, 2024 March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 23-0224-05
Idaho Power Company Forst Second Revised Sheet No. H-8
Cancels
I.P.U.C. No. 30, Tariff No. 101 oral-First Revised Sheet No. H-8
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
5. Vested Interest Charges
Additional Applicants connecting to a vested portion of a Line Installation will pay a Vested Interest
Charge to be refunded to the Vested Interest Holder. Additional applicants will have two payment
options:
Option One - An Additional Applicant may choose to pay an amount determined by this
equation:
Vested Interest Charge = A x B x C where;
A = Load Ratio: Additional Applicant's Connected Load divided by the sum of
Additional Applicant's Connected Load and Vested Interest Holder's load.
B = Distance Ratio: Additional Applicant's distance divided by original distance.
C = Vested Interest Holder's unrefunded contribution.
Option Two - An Additional Applicant may choose to pay the current Vested Interest, in
which case the Additional Applicant will become the Vested Interest Holder and, as such,
will become eligible to receive Vested Interest Refunds in accordance with Section 8.a.
If Option One is selected, the Additional Applicant has no Vested Interest and the previous Vested
Interest Holder remains the Vested Interest Holder. The Vested Interest Holder's Vested Interest
will be reduced by the newest Additional Applicant's payment.
The Vested Interest Charge will not exceed the sum of the Vested Interests in the Line Installation.
If an Additional Applicant connects to a portion of a vested Line Installation which was established
under a prior rule or schedule, the Vested Interest Charges of the previous rule or schedule apply
to the Additional Applicant.
6. Other Charges
a. Alteration Charges. If an Applicant or Additional Applicant requests a Relocation, Upgrade,
Conversion or removal of Company facilities, the Applicant or Additional Applicant will pay
a non-refundable charge equal to the Cost Quote.
b. Engineering Charge. Applicants or Additional Applicants will be required to prepay all
engineering costs for Line Installations and/or Alterations greater than 16 estimated hours.
Estimates equal to or less than 16 hours will be billed to the Applicant or Additional
Applicant as part of the construction costs, or after the engineering is completed in
instances where construction is not requested. Engineering charges will be calculated at
$930097.00 per hour.
IDAHO Issued by IDAHO POWER COMPANY
Issued —-
DeGeRgbeF 26 202, December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—_ MaFGh 15, 2024 March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 23-0224-05
Idaho Power Company Forst Second Revised Sheet No. H-9
Cancels
I.P.U.C. No. 30, Tariff No. 101 Ofk'nal-First Revised Sheet No. H-9
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
6. Other Charges (Continued)
C. Engineering Charges for Agencies and Taxing Districts of the State of Idaho. Under the
authority of Idaho Code § 67-2302, an agency or taxing district of the State of Idaho may
invoke its right to decline to pay engineering charges until the engineering services have
been performed and billed to the agency or taxing district. Any state agency or taxing
district that claims it falls within the provisions of Idaho Code § 67-2302 must notify Idaho
Power of such claim at the time Idaho Power requests prepayment of the engineering
charges. Idaho Power may require that the state agency or taxing district's claim be in
writing. If the state agency or taxing district that has invoked the provisions of Idaho Code
§ 67-2302 does not pay the engineering charges within the 60-day period as provided in
that statute, all the provisions of that statute will apply.
d. Joint Trench Charge. Applicants, Additional Applicants, and subdividers will pay the
Company for trench and backfill costs included in the Cost Quote. In the event the
Company is able to defray any of the trench and backfill costs by sharing a trench with
other utilities, the cost reduction will be included in the Cost Quote.
e. Rights-of-Way and Easement Charge. Applicants or Additional Applicants will be
responsible for any costs associated with the acquisition of rights-of-way or easements.
f. Temporary Line Installation Charge. Applicants or Additional Applicants will pay the
installation and removal costs of providing Temporary Line Installations.
g. Temporary Service Attachment Charge. Applicants or Additional Applicants will pay for
Temporary Service Attachments as follows:
i. Underground - $74.0076.00
The customer-provided meter post must be set within two linear feet of the
Company's existing transformer or junction box.
IDAHO Issued by IDAHO POWER COMPANY
Issued-—_ DeGe bee 26 2023December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—_ MaFGh 15, 2024 March 15, 2025 1221 West Idaho Street, Boise, Idaho
Advice No. 23-0224-05
Idaho Power Company First Second Revised Sheet No. H-10
Cancels
I.P.U.C. No. 30, Tariff No. 1010#gwa4-First Revised Sheet No. H-10
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
6. Other Charges (Continued)
g. Temporary Service Attachment Charge (Continued)
ii. Overhead - $359.00330.00
The customer-provided meter pole shall be set in a location that does not require
more than 100 feet of#2 aluminum service conductor that can be readily attached
to the permanent location by merely relocating it.
The electrical facilities provided by the customer on the meter pole shall be
properly grounded, electrically safe, meet all clearance requirements, and ready
for connection to Company facilities.
The customer shall obtain all permits required by the applicable state, county, or municipal
governments and will provide copies or verification to the Company as required. The above
conditions must be satisfied before the service will be attached.
h. Temporary Service (Overhead or Underground), Overhead Permanent, and Customer
Provided Trench Inspection Return Trip Charge. A Return Trip Charge of$74.O076.00 will
be assessed each time Company personnel are dispatched to the job site, but are unable
to connect the service. The charge will be billed after the conditions have been satisfied
and the connection has been made.
i. Unusual Conditions Charge. Applicants, Additional Applicants, and subdividers will pay
the Company the additional costs associated with any Unusual Conditions included in the
Cost Quote. This payment, or portion thereof, will be refunded to the extent that the
Unusual Conditions are not encountered.
In the event that the estimate of the Unusual Conditions included in the Cost Quote is equal to or greater
than $10,000, the Applicant, Additional Applicant or subdivider may either pay for the Unusual Conditions
or, at the option of the Company, may furnish an Irrevocable Letter of Credit drawn on a local bank or
local branch office issued in the name of Idaho Power Company for the amount of the Unusual
Conditions. Upon completion of that portion of the project which included an Unusual Conditions estimate,
Idaho Power Company will bill the Applicant, Additional Applicant or subdivider for the amount of Unusual
Conditions encountered up to the amount established in the Irrevocable Letter of Credit. The Applicant,
Additional Applicant or subdivider will have 15 days from the issuance of the Unusual Conditions billing
to make payment. If the Applicant, Additional Applicant or subdivider fails to pay the Unusual Conditions
bill within 15 days, Idaho Power will request payment from the bank.
IDAHO Issued by IDAHO POWER COMPANY
Issued --
DeGember 26 202- December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective- n aFGh 15, 2 March 15, 2025
ndvoGe No 23 02 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05
Idaho Power Company First Second Revised Sheet No. H-11
Cancels
I.P.U.C. No. 30, Tariff No. 1010#gwa4-First Revised Sheet No. H-11
RULE H
NEW SERVICE ATTACHMENTS
AND DISTRIBUTION LINE
INSTALLATIONS OR
ALTERATIONS
(Continued)
6. Other Charges (Continued)
j. Underground Service Return Trip Charge. When a customer agrees to supply the trench,
backfill, conduit, and compaction for an underground service, an Underground Service
Return Trip Charge of $123.00126.00 will be assessed each time the Company's
installation crew is dispatched to the job site at the customer's request, but is unable to
complete the cable installation and energize the service due to the Company's required
specifications not being met.
7. Line Installation, Shared Terminal Facilities and Service Attachment Allowances
The Company will contribute an Allowance toward the cost of Terminal Facilities associated with
an additional Line Installation and/or Service Attachment. If a Customer increases their
consumptive load and is responsible for upgrading Shared Terminal Facilities, such Customer will
receive an Allowance toward the cost of the upgraded Shared Terminal Facilities. Allowances are
based on the cost of providing and installing Standard Terminal Facilities for single phase and
three phase services.
a. Allowances for Overhead and Underground Line Installations, Shared Terminal Facilities
and Overhead Service Attachments
Class of Service Maximum Allowance per Service
Residential:
Schedules 1, 3, 5, 6 $3,8�o4,233.00
Non-residence $ 0.00
Non-residential:
Schedules 7, 8, 9, 24
Single Phase $3,Q�04,233.00
Three Phase $ 908,707.00
Large Power Service
Schedule 19 Case-By-Case
b. Allowances for Subdivisions and Multiple Occupancy Projects
Developers of Subdivisions and Multiple Occupancy Projects will receive a
$3,�04,233.00 Allowance for each single phase transformer installed within a
development and a $7,863-008,7 77.00 Allowance for each three phase transformer
installed within a development. Subdividers will be eligible to receive Allowances for
Terminal Facilities installed inside residential and non-residential subdivisions.
IDAHO Issued by IDAHO POWER COMPANY
Issued-— DeGember 26 202- December 20, 2024 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—_ MaFGh 15, 2024 March 15, 2025
Ad v i_e No 23_02- 1221 West Idaho Street, Boise, Idaho
Advice No. 24-05