HomeMy WebLinkAboutDP GT 2021 - Form PU - Pipeline Safety File Upload Form
I 'A •
This form is used to upload content for posting,to the PUC public Pipeline Safety web page.
Form ID
Populated after save
Document Year* Topics*
2021 Pipeline Operators
Please 4 digit year(ex:2024)
Pipeline Operators
Select Company
Avista Douglas Pipeline Company Enbridge
Northwest Gas Processing Intermountain Gas
Document Type*
Annual Reports
Company Type
Gas Distribution System (GD) Gas Transmission System (GT)
Gas Transmission and Gathering System (GG) Liquified Natural Gas Facility(LNG)
File Upload
Please allow up to 40 seconds for each file to upload(dependent on file size).
File Upload*
2021 Douglas GT Annual Report.pdf 379.87KB
Date Submitted
2024-12-12