Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 240930 NWGP NTSB Recommendations Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Galli Date(s): 9/30/2024 Company/Owner: Northwest Gas Processing(NWGP) Unit WOPID 139370 Inspection Type & Time 1 day, 0.5 day) I Total Inspection Da s: 0.25 Standard: 10.25 1 Training:I I Integrity Management: Incident: Follow-up: OQ: I I Damage Prevention: D&A: Inspection Summary IPUC inspector Galli reviewed the 2024 NTSB Recommendations for Northwest Gas Processing. All applicable sections have been found to be in compliance. Corrective Action Required: YeslNol X Follow-up Required: by(date): Yesl I Nol X Inspector(Lead): Date: 9/30/2024 Galli Reviewer: Date: 10 -17-�� Brooks IPUC Form 1