HomeMy WebLinkAboutDouglas Pipeline Company 240930 DPC NTSB Recommendations Idaho PUC Pipeline Safety Inspection Summary
Inspector(s):I Galli Date(s): 9/30/2024
Company/Owner: Douglas Pipeline Company(DPC) FUnit#/OPID 131442
Inspection Type & Time 1 day, 0.5 day) Total Inspection Days:10.25
Standard: 10.25 1 Training:1 1 Integrity Management: Incident:
Follow-up: OQ: I I Damage Prevention: D&A:
Inspection Summary
IPUC inspector Galli reviewed the 2024 NTSB Recommendations for Douglas Pipeline Company. All
applicable sections have been found to be in compliance.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yesl jNolX
Inspector (Lead): Date: 9/30/2024
Galli
Reviewer:
Date: (0. 17
Brooks
IPUC Form 1