Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 240930 IGC NTSB Recommendations
Idaho PUC Pipeline Safety Inspection Summary Inspector(s):I Galli I Date(s): 9/30/2024 Company/Owner: Intermountain Gas Company(IGC) I Unit#/OPID 18160 Inspection Type & Time 1 day, 0.5 day) Total Inspection Da s: 0.25 Standard: 0.25 Training: Integrity Management: Incident: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary IPUC inspector Galli reviewed the 2024 NTSB Recommendations for Intermountain Gas Company. All applicable sections have been found to be in compliance. Corrective Action Required: Yesl lNolX Follow-up Required: by(date): Yesl INolX Inspector (Lead): `r Date: 9/30/2024 Galli - Reviewer: Date: 7-A- Brooks 10-1 IPUC Form 1