Loading...
HomeMy WebLinkAboutIntermountain Gas 240916-19 IGC Rexburg Idaho PUC Pipeline Safety Inspection Summary Inspector(s): jPerkins Date(s): 09/16/2024- 09/19/2024 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: Construction:= Training: (T)(D)Integrity Management: 4.0 Incident: M/M: Follow-up: F1 OQ: a Damage Prevention: El D&A: Inspection Summary Audit consisted of tea Integrity Management (TIMP)/External Corrosion Direct Assessment/ECDA verification digs in Rexburg/Rigby, Idaho. Sep 16-18, 2024: (.5 Standard) 2.5 TIMP/ECDA) Inspector traveled to Rexburg, Idaho and met with IGC personnel for an IM/ECDA verification dig at 310 S Fifth W Rexburg, Rexburg, ID. And 72 N 3700 E Rigby, ID. IGC personnel contracted Acuren/KV Utilities to perform ECDA Survey. Observed JSA, traffic control, line location,excavation, anamoly locates/depth gauging,jeeping, cleaning pipe, removing coating, backfilling, bedding, pipe wrapping, soil resitivity testing, wall thickness survey, metalurgy testing, Mag particle testing of anomolies, MMT's Hardness, Strength and Ductility Tester(HSD) assessing condition/type of pipe, thickness, and notch v marks. Sep 19,2024: ( 1 Standard) Traveled back to Boise and completed reports. Attached: IPUC Form 1, Inspection Summary Locate tickets Maps of site Photos Corrective Action Required: Yes Na X Follow-up Required: by(date): Yes No X Inspector (Lead): Date: B Perkins '2 9/19/2024 Reviewer: Date: J Brooks IPUC Form 1