Loading...
HomeMy WebLinkAboutIntermountain Gas 241125 Boise Construction IPUC Construction Inspection Inspector(s): Galli, Perkins Date(s): 11/25/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC Address: 1334 W Highland St City/District: Boise Contractor/Job#: Foreman: Employees: Dasco 425-05613 Ethan Call Juan Hernandez, Alex Rodriquez, Seth Lynn Job Description: %" Service Line(s) from System Type: z Distribution ❑ Transmission 3/4" steel service line Operator Supervisor: Joe One-Call Ticket: 2024452317 On-Site: N Total Inspection Days: 2.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 No sand needed SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 Coat tar coating intact OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 94 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purim N/A OPS 603 18. Safety Equipment SAT SF 418 Fire extinguisher and SF 422 JSA 19. Abandonment N/A I OPS 607 20. Line Locating SAT OPS 611 Hand dig to find stub IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Manual Butt Fusion - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 - Heat Plate OPS 325 -Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe SAT OPS 200 Welded V transition - Welder(s) Qualified OPS 201 UT thickness measured Pipe/Coating—Inspected/Repaired OPS 202 at .115 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Observations Included: Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, valid dig ticket, observed UT reads at .115, welded on a V steel to PE transition, EFV 1200 installation, tracer wire, successful pressure test at 94 psi for 15 minutes and observed partial bedding. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes Inspector(Lead): �100,,� Date: 11/25/2024 Galli l Reviewer: Date: Brooks I P U C Form 4 Rev. 12/21/2023