Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 241121 Shoshone Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 11/21/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 416 N Edith St city/District: Shoshone Contractor/Job#: Foreman: Employees: KV Utilities 569-02384 Blake Hall See lineup in file Job Description: %" Service Line(s) from System Type: x Distribution ❑ Transmission 2" steel main _ Operator Supervisor: One-Call Ticket: 2024462689 On-Site: N Total Inspection Days: 0.5 Const 0.5 Travel Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 Boring OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation (Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 Fire extinguisher& SF 422 JSA 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Potholing IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Manual Butt Fusion -Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Observations Included: Line Locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, valid dig ticket, potholing, boring, manual butt fusion to install weak link for pullback. Quizzed KV employee on fusion procedures. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Galli �_� Date: 11/21/2024 Reviewer: Brooks Date: IPUC Form 4 Rev. 12/21/2023