HomeMy WebLinkAboutIntermountain Gas 241119 Kimberly Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 11/19/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 924 Vista Ave City/District: Kimberly Contractor/Job#: Foreman: Employees: KV Utilities 585-02637 Blake Hall See lineup in file Job Description: %" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Jake Robertson One-Call Ticket: 2024470440 On-Site: Y Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 18 inches OPS 322 3. Bedding/Backfill N/A OPS 308 No sand needed J SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 Correct Meter location 14. Equipment Calibration Verification N/A OPS 501 N/A 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 Fire extinguisher& JSA SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Hand dig to expose stub I P U C Form 4 Rev.12/21/2023 IPUC Construction Inspection 21. Plastic Pine N/A OPS 307 - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Address: 924 Vista Ave, Kimberly, ID Observations Included: Line locating, correct trench depth, safety equipment, verification OQ records, and valid dig ticket. Quizzed KV employee on trench depth and spacing with other utilities. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Attempted to observe an IGC crew fix a leak on Aldyl-A pipe at 1257 Park Meadows Drive in Twin Falls but was unable to meet the crew due to other work in the district. Attempted to observe a second KV utilities crew at 501 Thompson Court in Jerome, ID but was unable to observe any gas work due to the crew rock hammering the trench. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 11/19/2024 Galli Reviewer: Brooks Date: IPUC Form 4 Rev. 12/2112023