Intermountain Gas 241118-22 Twin Falls Construction
I PUC Construction Inspection Inspector(s): Perkins/Galli Date(s): 11/18-11/22-2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: See back for addresses(s) City/District: Twin Falls/Ketchum/HaileyBellevue Contractor/Job#: Foreman: Employees: See Job List/Lineups in file 02637-585, 00105-517, See lineups for 04539-521 Foreman Job Description: Abandon 3/" service line, install System Type: s Distribution ❑ Transmission %" service lines Operator Supervisor: One-Call Ticket: 2024453369, 2024461867, On-Site: N 2024461896 Total Inspection Days: 4.5 inspect/1.0 days travel Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 30" OPS 322 3. Bedding/Backfill SAT OPS 308 Sand/Native soil SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 98 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 JSA & Fire Extinguisher SF 422 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 19. Abandonment SAT OPS 607 Purged and sealed pipe 20. Line LocatingSAT OPS 611 21. Plastic Pipe SAT OPS 307 Fusing and stab fitting - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins traveled to Twin Falls district and observed KV a contractor for IGC performing installations. (Perkins 0.5)(18 Nov) Address: (Perkins 0.5)(18 Nov) 507 Falling Leaf, Twin Falls, ID and 924 Vista Ave, Kimberly, ID (Unable to do either job as the snowfall on 11/17 erased all locates). Crew called in for new locates. Address: (Perkins 0.5)(19 Nov) 219 E Canyon Run Blvd, Ketchum, Idaho Observations Included: Abandoning 3/" service, purging, sealing pipe, backfill, trenching, stab fitting, trenching, line locating, tracer wire, safety equipment, verification of OQ records. Address: (Perkins 0.5)(19 Nov) 180 Sunbeam St. Hailey, Idaho Observations Included: Install 3/" service line, line locating, trenching, bedding, backfill,pressure test, purge, fusing, stab fitting, tracer wire, safety equipment, equipment calibrations, Verification of OQ records. Address: (Perkins 1.0/Galli 1.0)(20 Nov) 205 Equus Loop, Bellevue, Idaho Observations Included: trenching, line locating, potholing, verification of OQ records, safety equipment. Address: (Perkins 1.0)(21 Nov) 205 Equus Loop, Bellevue, Idaho. Observations Included: Trenching, line locating, potholing,boring, tracer wire, verification of OQ records, equipment calibrations, tracer wire. IPUC inspector traveled back to Boise (Perkins 0.5)(22 Nov) completed forms. Corrective Action Required: Yes No X Follow-up Required: By Datp: Yes No X Inspector (Lead): Date: 11/22/2024 Perkins Reviewer: Brooks Date: _l1 � IPUC Form 4 Rev. 12/21/2023