Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 241118 Rupert Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 11/18/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 1322 K St,400 Edgewater Drive City/District: Rupert Contractor/Job#: Foreman: Employees: KV Utilities 621-02195 Lyle Hawkins See lineup in file 613-04387 Job Description: %" Service Line(s) System Type: x Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024453405,2024450714 On-Site: N Total Inspection Days: 0.5 Travel 0.5 Const Tasks: Ratin Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 No sand needed SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 minutes 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 Fire extinguisher& JSA SF 422 19. Abandonment N/A OPS 607 20. Line LocatingSAT OPS 611 Hand di to ex ose stub IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Manual Butt Fusion - Joiner(s) Qualified OPS 309 Stab fittings (coupler) - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 1 Additional Comments: Address: 1322 K St, Rupert, ID Observations Included: Correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, valid dig ticket, tracer wire install, manual butt fusions inspected for acceptable rollback, mechanical fittings, EFV 1200 installation, successful pressure test at 96 psi for 15 minutes, squeeze off, bedding and backfill. Quizzed KV employee on squeeze off procedures. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Address: 1509 W Shortt Lane, Rupert, ID Observations Included: Postponed work due to no locates. Address: 400 Edgewater Drive, Burley, ID Observations Included: Line locating, safety equipment, correct trench depth. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead):Galli i Date: 11/18/2024 —_ �� Reviewer: Brooks Date: IPUC Form 4 Rev. 12/2v2023