HomeMy WebLinkAboutIntermountain Gas 241106 Caldwell Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 11/06/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 16342/16330/16318 Grade Ave City/District: Caldwell
Contractor/Job #: Foreman: Employees:
24 JUS 1-6,4-6,5-6 Rigo Chavarin See lineup in file
Job Description: %" Service Line(s) System Type: x Distribution ❑ Transmission
Operator Supervisor: Joe One-Call Ticket: 2024443618/2024443617/
On-Site: Y 2024443616
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches
OPS 322
3. Bedding/Backfill SAT OPS 308 Native soil used
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min
9. OQ Qualifications SAT OPS 800 Verified
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Verified
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603 Cleaning Purge
18. Safety Equipment SAT SF 418 Fire extinguisher and
SF 422 JSA
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611 Hand dig to find stub
IPUC Form 4 Rev. 12121/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307 Continental Stab Coupler
- Joiner(s) Qualified OPS 309 and fusing
- Fusion Tools OPS 324
- Heat Plate OPS 325
-Joining Procedure OPS 800
-Squeeze Off
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
Address: 16342/16330/16318 Grade Ave Caldwell, Idaho
Observations Included: Line locating, correct trench depth, safety equipment, verification OQ records,
verification equipment calibrations, tracer wire install, mechanical fittings (couplers), fusing, EFV 1200
installation, successful pressure test at 96 psi for 15 minutes, cleaning purge, bedding, backfill and
continuity test. On 16342 Grade Ave, fuser did not successfully complete pressure test to include all
fittings, did not shade before pressure test and attempted to stab house service line onto service stub
before pressure testing. All items were corrected by(IPUC, IGC and Das-Co leadership)prior to service
line being put into service. Quizzed employee on line locating procedures, and squeeze times.
Corrective Action Required: 1202419 Yes X jNo
Follow-up Required: By Date: 12/6/2024 Yes X No
Inspector(Lead):
Perkins Date: 11/6/2024
Reviewer:
Brooks Date: �(- 7-a4
IPUC Form 4 Rev. 12/21/2023