Loading...
HomeMy WebLinkAboutIntermountain Gas 241105 Eagle Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 11/05/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 8281 W Pacific Yew Street City/District: Eagle 7908 W Donatella St Contractor/Job#: Foreman: Employees: 417-048747, 417-016155 Pedro Velaquez See lineup in file Job Description: V Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Joe One-Call Ticket: 2024442710,2024442714 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 24 inches OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min 9. OQ Qualifications SAT OPS 800 Verified 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 Cleaning Purge 18. Safety Equipment SAT SF 418 Fire extinguisher and SF 422 JSA 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Hand dig to find stub IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Continental Stab Coupler _- - Joiner(s) Qualified OPS 309 Manual Butt Fusion - Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Address: 8281 W Pacific Yew St, Eagle Observations Included: Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, valid dig ticket, tracer wire install, mechanical fittings (couplers), EFV 1200 installation, successful pressure test at 96 psi for 15 minutes, cleaning purge, bedding, backfill and continuity test. Quizzed employee on AOCs of squeeze off procedures. Address: 7908 W Donatella St, Eagle Observations Included: Line locating, correct trench depth, safety equipment and manual butt fusion. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Galli Date: 11/5/2024 I Reviewer: Date: Brooks IPUC Form 4 Rev. 12/2vzo23