Loading...
HomeMy WebLinkAboutIntermountain Gas 241031 Middleton Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 10/31/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 1987 N Meadow Wood Ave City/District: Middleton Contractor/Job Foreman. Employees: See line-up in file 004700-363 Juan Soto Job Description: Install V Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024434188 On-Site: N Total Inspection Days: .5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, N/A OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration,Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Re lator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17 Purgc N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pine N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 1 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC trenching to install 3/" Service line in Middleton, ID. Address: 1987 N Meadow Wood Ave Observations Include: Verification of OQ records, line locating and trenching. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date Yes No X Inspector (Lead): Perkins Date: 10/31/2024 Reviewer: Brooks Date://-7-J q IPUC Form 4 Rev. 122/21/2023