HomeMy WebLinkAboutIntermountain Gas 241029 Garden City Construction IPUC Construction Inspection
Inspector(s): Galli Date(s): 10/29/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC
Address: 5663 N Glenwood City/District: Garden City
Contractor/Job#: Foreman: Employees: See Job List
421-006724 Jesus Garcia
Job Description: V Service Line(s) System Type: ® Distribution ❑ Transmission
from 2" Main
Operator Supervisor: Will One-Call Ticket: 2024433075
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS l l
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 Bore crew 24 inches
OPS 322
3. Bedding/Backfill SAT OPS 308 Sand used
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 minutes
9. OQ Qualifications SAT OPS 800 Verified
10. Casing Seal/Installation SAT OPS 325 Sleeve V through 2"PE
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Verified
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603 Cleani purge
18. Safety Equipment SAT SF 418 Fire extinguisher
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611 Hand dig near main
Visible Markings
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307 Saddle Tee
- Joiner(s) Qualified OPS 309 Manual Butt Fusion
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
-Squeeze Off
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
Address: 5663 N Glenwood, Garden City, ID
Observations Included: Saw cutting, line locating(hand dig near main), boring, pullback, sleeved a 3/"
PE service line through a section of 2"PE pipe, correct trench depth, safety equipment, verification OQ
records, verification equipment calibrations, valid dig ticket, tracer wire install, mechanical fittings
(saddle tee), manual butt fusion, EFV 1200 installation, successful pressure test at 96 psi for 15 minutes,
cleaning purge, bedding and backfill. All observed procedures were completed in accordance with IGC
Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead):
Date: 10/29/2024
Galli
Reviewer: 'I
Brooks Date: 10.3�•