Loading...
HomeMy WebLinkAboutIntermountain Gas 241028 Meridian Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 10/28/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: Inspirado Subdivision (near Chinden City/District: Meridian Star Road intersection Contractor/Job #: Foreman: Employees: Jesse Jaramillo 367-0528 Juan Carlos Pozos Job Description: 2" Main Line with V Service System Type: ® Distribution ❑ Transmission Stubs(s) Operator Supervisor: One-Call Ticket: N/A On-Site: N Total Inspection Days: 1.0 Tasks: I Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 36 inches. Trench OPS 322 __provided 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 14-gauge OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 Did not witness full test 9. OQ Qualifications SAT OPS 800 Verified 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Verified 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pur`,c SAT OPS 603 Cleaning purge 18. Safety Equipment SAT SF 418 Fire extinguisher SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT 7 OPS 611 Observed ELM IPUC Form 4 Rev. 12//2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Manual Butt Fusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 -Squeeze Off 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: Address: Inspirado#2 (near Chinden and Star Road intersection) Observations Included: Line locating(observed ELM refresh the markings), correct trench depth provided, safety equipment, verification OQ records, verification of equipment calibrations, tracer wire installed, bedding observed with sand, manual butt fusion, cleaning purge with compressed air,pressure test started at 96 psi (did not observe completed test), squeeze off,bedding and backfill. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X inspector (Lead): Date: 10/28/2024 Galli Reviewer: Brooks Date: �0_�-�1.� I P U C Form 4 Rev. 12/21/2023