Loading...
HomeMy WebLinkAboutIntermountain Gas 241023 Nampa Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 10/23/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 706 N Pit Ln Shop City/District: Nampa Contractor/Job# Foreman: Employees: See Job List 053513-371 Jesus Garcia Job Description: Install 3/" Service Line off 2" System Type: ® Distribution ❑ Transmission main Operator Supervisor: One-Call Ticket: 2024393639 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 55' run 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 1200 EFV 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Pot Holing IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Fused riser and EFV - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC install a 3/4" service line in Nampa, ID. Address: 706 N Pit Ln Shop Observations Include: Fusing, verification of OQ records, potholing, line locating, boring, service line pull-back, trenching, EFV install and tracer wire tie-in. Quizzed personnel on AOCs for bolt on tapping tee. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date;, Yes No X Inspector (Lead): Perkins Date: 10/23/2024 Reviewer: IV Brooks Date: ,Z_� IPUC Form 4 Rev. 12/21/2023